35 Ill. Adm. Code 817.410
Final Cover System
Section 817
Section 817.410 Final Cover
System
a) The unit shall be covered by a final cover consisting of a low
permeability layer overlain by a final protective layer constructed in
accordance with the requirements of this Section.
b) Standards for the low permeability layer:
1) Construction of a low permeability layer shall begin not later
than 60 days after placement of the final lift of solid waste.
2) The low permeability layer shall cover the entire unit and
connect with the liner system.
3) The low permeability layer shall consist of any one of the
following:
A) A compacted earth layer constructed in accordance with the
following standards:
i) The minimum allowable thickness shall be 0.61 meters (2.0
feet).
ii) The layer shall be compacted to achieve a permeability of
1x(10
-7
) centimeters per second and minimize void spaces.
iii) Alternative specifications may be utilized provided that the
performance of the low permeability layer is equal to or superior to the
performance of a layer meeting the requirements of subsections (b)(3)(A)(i) and
(b)(3)(A)(ii) above.
B) A geomembrane constructed in accordance with the following
standards:
i) The geomembrane shall provide performance equal or superior
to the compacted earth layer described in subsection (b)(3)(A) above.
ii) The geomembrane shall have strength to withstand the normal
stresses imposed by the waste stabilization process.
iii) The geomembrane shall be placed over a prepared base free
from sharp objects and other materials which may cause damage.
C) Any other low permeability layer construction techniques or
materials, provided that they provide equivalent or superior performance to the
requirements of this subsection.
c) Standards for the final protective layer:
1) The final protective layer shall cover the entire low
permeability layer.
2) The thickness of the final protective layer shall be
sufficient to protect the low permeability layer from freezing and minimize
root penetration of the low permeability layer, but shall not be less than 0.46
meter (1.5 feet).
3) The final protective layer shall consist of soil material
capable of supporting vegetation.
4) The final protective layer shall be placed as soon as possible
after placement of the low permeability layer to prevent desiccation, cracking,
freezing or other damage to the low permeability layer.