a) Composting Process
1) All permitted landscape waste compost facilities must meet the
following composting process standards:
A) Landscape waste must be processed within 24 hours after receipt
at the facility into windrows, other piles or a contained composting system
providing proper conditions for composting. Incoming leaves, and brush or
woody landscape waste, may be stored in designated areas for use as a carbon
source and bulking agent, if so provided as a permit condition, rather than
being processed in windrows or other piles.
B) Unless the facility is designed for anaerobic composting, the
operator shall take measures to adjust the oxygen level, as necessary, to
promote aerobic composting. Aeration intensity must be altered to suit the
varying oxygen requirements that different landscape wastes may have.
C) The operator shall take measures to maintain the moisture level
of the composting material within a range of 40% to 60% on a dry weight basis.
D) The staging area must be adequate in size and design to
facilitate the unloading of landscape waste from delivery vehicles and the
unobstructed maneuvering of vehicles and other equipment.
E) Neither landscape waste nor composting material may be mixed
with end-product compost ready to be sold or offered for use. This prohibition
shall not apply to the use of end-product compost as an amendment to composting
material.
F) The facility must have sufficient equipment and personnel to
process incoming volumes of landscape waste accepted within the time frames
required in this Section, and sufficient capacity to handle projected incoming
volumes of landscape waste.
G) The operator shall obtain written authorization from the Agency
to use any additive, other than water, prior to its use. Unless otherwise
authorized any additive, or combination of additives, other than water, must
not exceed 10%, by volume, of the composting material.
2) An operator of a permitted landscape waste compost facility
using an open composting process shall turn each windrow or other pile at least
four times per year and not less than once every six months. This provision
does not apply to composting systems designed for anaerobic conditions.
3) An operator of a permitted landscape waste compost facility
using a contained composting process shall have mechanisms to control moisture,
air flow and air emissions. These mechanisms must be operated and maintained
throughout the landscape waste composting process as specified in any permit
required pursuant to 35 Ill. Adm. Code 831.
4) Operators of permitted facilities required to process
composting material to further reduce pathogens shall comply with the
applicable thermal processing requirement among the following:
A) If the facility uses a windrow composting process, during a 15
consecutive day period the temperature throughout each windrow must be
maintained at 55°C or greater and, during the same period, each windrow must be
turned a minimum of 5 times;
B) If the facility uses an aerated static pile composting process,
the composting material must be covered with 6 to 12 inches of insulating
material, and the temperature throughout each pile material must be maintained
at 55°C or greater for 3 consecutive days; and
C) If the facility uses an in-vessel composting process, the
temperature of the composting material throughout the mixture must be
maintained at 55°C or greater for 3 consecutive days.
b) Composting Surface
1) Open Composting Processes
A) Composting areas must be:
i) located on relatively impermeable soils, as demonstrated by
actual measurement;
ii) located on a base with resistance to saturated flow
equivalent to the resistance of relatively impermeable soil; or
iii) subject to an early detection and monitoring program,
pursuant to subsection (m)(3) of this Section.
B) The composting surface must be constructed and maintained to
allow:
i) Diversion of runon waters away from the landscape waste and
compost;
ii) Management of runoff waters and landscape waste leachate in
accordance with Section 830.204; and
iii) Facility operation during all weather conditions.
C) The surface of the landscape waste composting area of the
facility must be sloped at two percent or greater unless an alternative water
management system to promote drainage and to prevent surface water ponding is
approved in the facility permit.
2) Contained Composting Processes
A) Composting areas at facilities at which composting material or
leachate comes into contact with an open surface must be:
i) Located on relatively impermeable soils, as demonstrated by
actual measurement;
ii) located on a base with resistance to saturated flow
equivalent to the resistance of relatively impermeable soil; or
iii) Subject to an early detection and groundwater monitoring
program, pursuant to subsection (m)(4) of this Section.
B) The composting surface must support all structures and
equipment.
c) Utilities. All utilities necessary for safe operation in
compliance with the requirements of this Part, including, but not limited to,
lights, power, water supply and communications equipment, must be available at
the facility at all times.
d) Maintenance. The operator shall maintain and operate all
systems and related appurtenances and structures in a manner that facilitates
proper operations in compliance with the requirements of this Part. If a
breakdown of equipment occurs, standby equipment must be used or additional
equipment brought on site as necessary to comply with the requirements of this
Part and any pertinent permit conditions.
e) Open Burning. Open burning is prohibited except in accordance
with 35 Ill. Adm. Code 200 through 245.
f) Dust Control. The operator shall implement methods for
controlling dust in accordance with Subparts B and K of 35 Ill. Adm. Code 212.
g) Noise Control. The facility must be designed, constructed,
operated and maintained so as not to cause or contribute to a violation of 35
Ill. Adm. Code 900 through 905 or of Section 24 of the Act.
h) Vector Control. Insects, rodents, and other vectors must be
controlled so as not to cause or contribute to a violation of the Act.
i) Fire Protection. The operator shall institute fire
protection measures including, but not limited to, maintaining a supply of
water and radio or telephone access to the nearest fire department. Fire
extinguishers must be provided at two separate locations within the facility.
j) Litter Control. The operator shall control litter at the
facility. At a minimum:
1) The operator shall patrol the facility daily to check for
litter accumulation. All litter must be collected in a secure container for
later disposal; and
2) Litter must be confined to the property on which the facility
is located. At the conclusion of each day of operation, any litter strewn
beyond the confines of the facility must be collected and disposed of at a
facility approved to receive such waste in accordance with the applicable Board
regulations.
k) Management of Non-compostable Wastes. The operator shall
develop management procedures for collection, containment and disposal of
non-compostable wastes received at the facility. Disposal must be at a
facility approved to receive such waste in accordance with applicable Board
regulations at 35 Ill. Adm. Code 810 through 815.
l) Mud Tracking. The operator shall implement measures, such as
the use of wheel washing units or rumble strips, to prevent tracking of mud by
delivery vehicles onto public roadways.
m) Monitoring
1) At a minimum, for batch, windrow and pile systems:
A) The temperature of each batch, windrow or pile of composting
material must be monitored on a weekly basis;
B) The moisture level in each batch, windrow or pile of composting
material must be monitored once every two weeks; and
C) For aerobic composting, the oxygen level of each batch, windrow
or pile of composting material must be monitored weekly.
2) At a minimum, for in-vessel continuous feed systems:
A) The temperature of the composting material must be monitored
daily;
B) The moisture of the composting material must be monitored
daily, unless otherwise authorized by the Agency in a facility permit; and
C) For aerobic composting by means of an in-vessel continuous feed
system, the oxygen level of the composting material must be monitored daily.
3) Early detection and groundwater monitoring, if required
pursuant to Section 830.205(b)(1)(A) or Section 830.205(b)(2)(A), shall be done
in accordance with 35 Ill. Adm. Code 830.Appendix A.