35 Ill. Adm. Code 830.APPENDIX
A: Early Detection and Groundwater Monitoring Program
Section 830
Section 830.APPENDIX A:Â
Early Detection and Groundwater Monitoring Program
The operator of a compost
facility subject to the monitoring requirements of 35 Ill. Adm. Code
830.205(b)(1)(A) or 35 Ill. Adm. Code 830.205(b)(2)(A) shall implement an
Agency-approved monitoring program using, at a minimum, the procedures and
standards set forth in this Appendix.
a)Â Â Â Â Â Â Â Â Program.
1)Â Â Â Â Â Â Â Â The operator shall perform a hydrogeologic site investigation
pursuant to subsection (b) of this Appendix to characterize the subsurface and
determine the location and quality of groundwater beneath the facility.
2)Â Â Â Â Â Â Â Â An appropriate monitoring system must be designed, capable of
determining the compost facility's impact or potential impact on the quality of
groundwater beneath the facility.
3)Â Â Â Â Â Â Â Â If the water table is located greater than ten (10) feet below
ground surface and the soil has been classified as a soil exhibiting moderate
or poor drainage by the U.S. Department of Agriculture's Soil Conservation
Service on a published county soil survey map, the owner of operator shall
install either an early detection system, pursuant to subsection (d)(1) of this
Section, or a groundwater monitoring system, pursuant to subsection (d)(2) of
this Section. Otherwise, a groundwater monitoring system must be installed,
pursuant to subsection (d)(2) of this Section.
4)Â Â Â Â Â Â Â Â If either early detection monitoring or groundwater monitoring
indicates an impact on underground water beneath the facility, a site
evaluation must be performed, using the procedures set forth in subsection (e)
of this Section, and remedial action implemented, if appropriate.
5)        The results of the hydrogeologic site investigation and the
proposed monitoring system design must be submitted to the Agency as part of an
application for a facility permit.
b)        Hydrogeologic Site Investigation. The operator shall conduct
a hydrogeologic site investigation to obtain the following information:
1)Â Â Â Â Â Â Â Â The regional hydrogeologic setting of the facility, using
material available from Illinois scientific surveys, state and federal
organizations, water well drilling logs and previous investigations. A
complete list of references and any well logs utilized must be submitted to the
Agency with the results of the hydrogeologic site investigation;
2)Â Â Â Â Â Â Â Â The site-specific hydrogeologic setting of the facility, using
continuously sampled borings of the site and information collected from on-site
piezometers or monitoring wells. At a minimum, borings must be to a depth of
ten (10) feet;
3)Â Â Â Â Â Â Â Â Soil characteristics, including soil types and physical
properties of the underlying strata, including the potential pathways for
contaminant migration. Any confining unit relative to waste constituents
expected to be present must be identified;
4)Â Â Â Â Â Â Â Â Water-bearing sediments or geologic units beneath the
facility, their classification pursuant to 35 Ill. Adm. Code 620 and the
direction and rate of groundwater flow. Also, regional and local areas of
groundwater discharge and recharge affecting groundwater at the facility must
be identified; and
5)Â Â Â Â Â Â Â Â Water quality beneath the facility, including any potential
impact on groundwater. The groundwater quality analysis must take into account
the type of compost facility and its expected leachate constituents.
c)Â Â Â Â Â Â Â Â All drill holes, including exploration borings that are not
converted into monitoring wells, monitoring wells that are no longer necessary
to the operation of the facility, and other holes that may cause or facilitate
contamination of groundwater, must be sealed in accordance with the standards
of 35 Ill. Adm. Code 811.316.
d)Â Â Â Â Â Â Â Â Monitoring System
1)Â Â Â Â Â Â Â Â Early Detection System
A)Â Â Â Â Â Â Â Monitoring device(s) must be installed:
i)Â Â Â Â Â Â Â Â Â Hydraulically upgradient from the facility or at sufficient
distance from the composting area so as not to be affected by it, to establish
representative background water quality in the waters beneath (or near) the
facility; and
ii)Â Â Â Â Â Â Â Â Beneath and around the composting area, sufficient to enable
early detection of the downward migration of constituents related to the
composting activities at the facility.
B)Â Â Â Â Â Â Â The parameters monitored must be those expected to be in the
leachate, taking into consideration the type of compost facility.
C)Â Â Â Â Â Â Â If lysimeters are utilized, the following requirements must be
used in designing an adequate monitoring system;
i)Â Â Â Â Â Â Â Â Â Lysimeters must be located, when possible, in a depression in
the path of site runoff in each direction of flow and topographically low areas
associated with the unit(s).
ii)Â Â Â Â Â Â Â Â At a minimum, each lysimeter must be sampled within 48 hours
after each rain event exceeding 0.5 inches, provided that the rain event is not
within two weeks after the date previous samples were successfully collected.
iii)Â Â Â Â Â Â Â Any lysimeter placed around the perimeter must be installed
at an angle so that the cup of the lysimeter is beneath the unit(s).
2)Â Â Â Â Â Â Â Â Groundwater Monitoring System
A)Â Â Â Â Â Â Â Monitoring well(s) must be installed:
i)Â Â Â Â Â Â Â Â Â Hydraulically upgradient from the facility, to establish
representative background water quality in the groundwater beneath (or near)
the facility; and
ii)Â Â Â Â Â Â Â Â Hydraulically downgradient (i.e., in the direction of
decreasing static head) from the compost facility. Locations and depths of
monitoring wells must ensure detection of waste constituents that migrate from
the waste management unit to the groundwater.
B)Â Â Â Â Â Â Â The parameters monitored must be those expected to be in the
leachate, taking into consideration the type of compost facility.
C)Â Â Â Â Â Â Â The groundwater monitoring system must be installed at the
closest practicable distance from the composting area boundary, or at an
alternative distance specified by permit.
3)Â Â Â Â Â Â Â Â Approval of any early detection monitoring system or
groundwater monitoring system must be obtained from the Agency prior to
operation.
e)Â Â Â Â Â Â Â Â Evaluation
1)Â Â Â Â Â Â Â Â Further evaluation of an impact to underground water shall be
required if:
A)Â Â Â Â Â Â Â An exceedence of the appropriate standard as stated in 35 Ill.
Adm. Code 620 is confirmed;
B)Â Â Â Â Â Â Â A progressive increase in measured parameters other than pH is
observed over two consecutive sampling events; or
C)Â Â Â Â Â Â Â Where groundwater monitoring wells are used, a statistical
increase over background or upgradient concentrations, calculated in accordance
with 35 Ill. Adm. Code 811.320(e), is observed.
2)Â Â Â Â Â Â Â Â An impact as described in subsection (e)(1)(A) or (e)(1)(C) of
this Section must be confirmed by resampling the underground water within 30
days after the date on which the first sample analyses are received. The
operator shall provide notification to the Agency of the results of the
resampling analysis within 30 days after the date on which the sample analyses
are received, but no later than 90 days after the first samples were taken.
3)Â Â Â Â Â Â Â Â Within 60 days after the confirmation of impact but no later
than 120 days after the date on which the first sample was taken, the operator
shall propose as a permit modification a plan to address the impact, which may
include further evaluation of data, including the use of appropriate
statistical methods, groundwater monitoring or remedial action.