35 Ill. Adm. Code 831.115

Modification to Obtain Operating Authorization

Year: 2026Length: 64 wordsOfficial source
Section 831 Section 831.115  Modification to Obtain Operating Authorization Unless otherwise authorized in the facility permit, prior to placing into service any structure constructed at a facility, the applicant shall obtain an operating authorization as a permit condition.  In order to obtain such an operating authorization, the operator shall submit a report documenting that construction has been completed in accordance with the engineering design.
35 Ill. Adm. Code 831.115: Modification to Obtain Operating Authorization | Justis AI