35 Ill. Adm. Code 831.115
Modification to Obtain Operating Authorization
Section 831
Section 831.115 Modification
to Obtain Operating Authorization
Unless otherwise authorized in
the facility permit, prior to placing into service any structure constructed at
a facility, the applicant shall obtain an operating authorization as a permit
condition. In order to obtain such an operating authorization, the operator
shall submit a report documenting that construction has been completed in
accordance with the engineering design.