35 Ill. Adm. Code 845.200
Permit Requirements and Standards of Issuance
Section 845.200 Permit
Requirements and Standards of Issuance
a) Permit
Requirements
1) No
person may construct, install, or modify a CCR surface impoundment or related
treatment or mitigation facilities, including corrective action measures under
Subpart F, without a construction permit issued by the Agency under this Part.
2) Except
as provided in Section 845.230(d), no person may operate a CCR surface impoundment
without an operating permit issued by the Agency under this Part. For purposes
of this Part, a CCR surface impoundment starts operation upon initial receipt
of CCR.
3) No
person may perform corrective action at a CCR surface impoundment without obtaining
a construction permit for corrective action and modifying the facility's
operating permit, or modifying the facility's operating permit when the
approved corrective action does not require the modification of the CCR surface
impoundment or the installation or modification of related treatment or
mitigation facilities.
4) Except
as provided in Section 22.59(e) of the Act, no person may close a CCR surface
impoundment without obtaining a construction permit for closure issued by the
Agency under this Part.
5) A CCR
surface impoundment must maintain an operating permit until:
A) The
completion of post-closure care when the CCR surface impoundment is closed with
a final cover system; or
B) The
completion of groundwater monitoring under Section 845.740(b) when the CCR
surface impoundment is closed by removal.
6) The
Agency may issue a joint construction and operating permit.
b) Standards for Issuance
1) Except
as provided in subsection (b)(2), the Agency may not issue any construction or
operating permit required by this Part unless the applicant submits adequate
proof that the CCR surface impoundment will be constructed, modified or
operated so as not to cause a violation of the Act or Board rules.
2) The existence
of a violation of the Act, Board regulation, or Agency regulation will not
prevent the issuance of a construction or operating permit under this Part if:
A) The
applicant has been granted a variance or an adjusted standard from the
regulation by the Board;
B) The
permit application is for construction, installation, or operation of equipment
to alleviate or correct a violation; or
C) The
permit application is for construction, installation, or operation of equipment
necessary to restore, protect or enhance the environment.
3)
In
granting permits, the Agency may impose reasonable conditions specifically
related to the applicant's past compliance history with the Act as necessary to
correct, detect, or prevent noncompliance. The Agency may impose such other conditions
as may be necessary to accomplish the purpose of the Act and as are not
inconsistent with this Part.
[415 ILCS 5/39(a)]
4)
In
making its determinations on permit applications under this
Part
, the
Agency may consider prior adjudications of noncompliance with the Act by the
applicant that involved a release of a contaminant into the environment
.
[415 ILCS 5/39(a)]