35 Ill. Adm. Code 845.230
Operating Permits
Section 845.230 Operating Permits
The operating permit applications must contain the following
information and documents:
a) Initial
operating permit for a new CCR surface impoundment and any lateral expansion of
a CCR surface impoundment.
1) A demonstration
that the CCR surface impoundment, as built, meets the location standards in the
following Sections:
A) Section
845.300 (Placement Above the Uppermost Aquifer);
B) Section
845.310 (Wetlands);
C) Section
845.320 (Fault Areas);
D) Section
845.330 (Seismic Impact Zones); and
E) Section
845.340 (Unstable Areas and Floodplains);
2) Certification
from a qualified professional engineer that the composite liner, or if
applicable, the alternative composite liner, has been constructed in accordance
with the requirements of Section 845.400(b) or (c);
3) Certification
from a qualified professional engineer that the leachate collection system has
been constructed in accordance with the requirements of Section 845.420, if
applicable;
4) Evidence
that the permanent markers required by Section 845.130 have been installed;
5)
Documentation that the CCR surface impoundment, if not
incised, will be operated and maintained with one of the forms of slope
protection specified in Section 845.430;
6) Initial
hazard potential classification assessment and accompanying certification (see
Section 845.440(a)(2));
7) Initial
Emergency Action Plan and accompanying certification (see Section 845.520(e));
8) Initial
structural stability assessment and accompanying certification (see Section
845.450(c));
9) Initial
safety factor assessment and accompanying certification (see Section 845.460(b));
10) Fugitive
dust control plan and accompanying certification (see Section 845.500(b)(7));
11) Initial
inflow design flood control system plan and accompanying certification (see
Section 845.510(c)(3));
12) Proposed
groundwater monitoring program, including a minimum of eight independent
samples for each background and downgradient well (see Section 840.650(b));
13) Preliminary
written closure plan (see Section 845.720(a));
14) Initial
written post-closure care plan, if applicable (see Section 845.780(d));
15) An
analysis of the chemical constituents found within the CCR to be placed in the
CCR surface impoundment;
16) An
analysis of the chemical constituents of all waste streams, chemical additives,
and sorbent materials entering or contained in the CCR surface impoundment; and
17) A
certification that the owner or operator meets the financial assurance
requirements of Subpart I.
b) Renewal
Operating Permit
1) Documentation
that the CCR surface impoundment, if not incised, is being operated and
maintained with one of the forms of slope protection specified in Section
845.430;
2) Emergency
Action Plan certification if the plan was amended (see Section 845.520);
3) Fugitive
dust control plan certification if the plan was amended (see Section
845.500(b)(7));
4) Any
significant changes to the design and construction plans compiled under
subsection (d)(2)(A) or Section 845.220(a)(1);
5) A
statement that the groundwater monitoring has been conducted under an Agency
approved groundwater monitoring program;
6) Written
preliminary closure plan, if amended (see Section 845.720(a)); and
7) Written
post-closure care plan, if amended (see Section 845.780(d)).
c) Post-Closure
Care Operating Permit
The owner or operator of a CCR
surface impoundment conducting post-closure care under Section 845.780 must
maintain an operating permit until the completion of post-closure care. Any
changes to the post-closure care plan, groundwater monitoring system,
groundwater sampling and analysis program, and groundwater monitoring program
must be submitted to the Agency in an operating permit application.
d) Initial Operating Permit for Existing, Inactive
and Inactive Closed CCR Surface Impoundments
1) The
owner or operator of an existing, inactive or inactive closed CCR surface
impoundment who has not completed post-closure care must submit an initial
operating permit application to the Agency by October 31, 2021;
2)
The initial operating permit application for existing or
inactive CCR surface impoundments that have not completed an Agency approved
closure before July 30, 2021, must contain the following information and
documents on forms prescribed by the Agency:
A) The
history of construction specified in Section 845.220(a)(1);
B) An
analysis of the chemical constituents found within the CCR to be placed in the
CCR surface impoundment;
C) An
analysis of the chemical constituents of all waste streams, chemical additives
and sorbent materials entering or contained in the CCR surface impoundment;
D) A demonstration that the CCR surface impoundment,
as built, meets, or an explanation of how the CCR surface impoundments fails to
meet, the location standards in the following Sections:
i) Section
845.300 (Placement Above the Uppermost Aquifer);
ii) Section
845.310 (Wetlands);
iii) Section
845.320 (Fault Areas);
iv) Section
845.330 (Seismic Impact Zones); and
v) Section
845.340 (Unstable Areas);
E) Evidence
that the permanent markers required by Section 845.130 have been installed;
F) Documentation
that the CCR surface impoundment, if not incised, will be operated and
maintained with one of the forms of slope protection specified in Section
845.430;
G) Initial
Emergency Action Plan and accompanying certification (see Section 845.520(e));
H) Fugitive
dust control plan and accompanying certification (see Section 845.500(b)(7));
I) Groundwater
Monitoring Information:
i) A
hydrogeologic site characterization (see Section 845.620);
ii) Design
and construction plans of a groundwater monitoring system (see Section 845.630);
iii) A groundwater
sampling and analysis program that includes selection of the statistical
procedures to be used for evaluating groundwater monitoring data (see Section
845.640); and
iv) Proposed
groundwater monitoring program that includes a minimum of eight independent
samples for each background and downgradient well (see Section 845.650(b));
J) Preliminary
written closure plan (see Section 845.720(a));
K) Initial
written post-closure care plan, if applicable (see Section 845.780(d));
L) The
certification required by Section 845.400(h), or a statement that the CCR
surface impoundment does not have a liner that meets the requirements of
Section 845.400(b) or (c);
M) History
of known exceedances of the groundwater protection standards in Section
845.600, and any corrective action taken to remediate the groundwater;
N) A
certification that the owner or operator meets the financial assurance
requirements of Subpart I;
O) Hazard
potential classification assessment and accompanying certification (see Section
845.440(a)(2));
P) Structural
stability assessment and accompanying certification (see Section 845.450(c));
Q) Safety
factor assessment and accompanying certification (see Section 845.460(b));
R) Inflow
design flood control system plan and accompanying certification (see Section
845.510(c)(3));
S) Safety
and health plan (see Section 845.530); and
T) For
CCR surface impoundments required to close under 845.700, the proposed closure
priority categorization required by Section 845.700(g).
3)
The initial operating permit application for an existing or
inactive CCR surface impoundment where an Agency approved closure has been
completed before July 30, 2021, and where the impoundment is not an inactive
closed CCR surface impoundment, must contain the following information and
documents on forms prescribed by the Agency:
A) The
history of construction specified in Section 845.220(a)(1);
B) Evidence
that the permanent markers required by Section 845.130 have been installed;
C) Documentation
that the CCR surface impoundment, if not incised, will be operated and
maintained with one of the forms of slope protection specified in Section
845.430;
D) Emergency
Action Plan certification (see Section 845.520(e));
E) Groundwater
monitoring information:
i) A
hydrogeologic site characterization meeting the requirements of Section
845.620;
ii) Design
and construction plans of a groundwater monitoring system meeting the
requirements of Section 845.630;
iii) A
groundwater sampling and analysis program that includes selection of the
statistical procedures to be used for evaluating groundwater monitoring data
(see Section 845.640); and
iv) Proposed
groundwater monitoring program that includes a minimum of eight independent
samples for each background and downgradient well (see Section 845.650(b));
F) Written
post-closure care plan, if applicable (see Section 845.780(d));
G) History
of known exceedances of the groundwater protection standards in Section
845.600, and any corrective action plan taken to remediate the groundwater.
4) The
initial operating permit application for inactive closed CCR surface
impoundments must contain the following information:
A) Evidence
that the permanent markers required by Section 845.130 have been installed;
B) Groundwater
monitoring program;
C) Written
post-closure care plan (see Section 845.780(d)); and
D) History
of known exceedances of the groundwater quality standards in 35 Ill. Adm. Code
620, whether the owner or operator has obtained a groundwater management zone,
and any corrective action taken to remediate the groundwater.
e) Operating permits must