35 Ill. Adm. Code 845.300
Placement Above the Uppermost Aquifer
Section 845.300
Placement Above the
Uppermost Aquifer
a) Existing
and new CCR surface impoundments, and all lateral expansions of CCR surface
impoundments, must be constructed with a base that is located at least 1.52
meters (five feet) above the upper limit of the uppermost aquifer, or must
demonstrate that there will not be an intermittent, recurring, or sustained
hydraulic connection between any portion of the base of the CCR surface
impoundment and the uppermost aquifer due to normal fluctuations in groundwater
elevations (including the seasonal high water table).
b) The
owner or operator of the CCR surface impoundment must obtain a certification
from a qualified professional engineer stating that the demonstration meets the
requirements of subsection (a).
c) The
owner or operator of an existing CCR surface impoundment must complete the
demonstration required by subsection (a) and submit the completed demonstration,
along with a qualified professional engineer's certification, to the Agency in
the facility's initial operating permit application.
d) The
owner or operator of a new CCR surface impoundment or a lateral expansion of a
CCR surface impoundment must submit plans and specifications in a construction
permit application that demonstrate the CCR surface impoundment will be
constructed under subsection (a). Upon completion of construction, the owner
or operator must obtain a certification from a qualified professional engineer
that the CCR surface impoundment or lateral expansion was constructed in
accordance with the requirements in subsection (a) and submit the certification
to the Agency in the facility's initial operating permit application.