35 Ill. Adm. Code 845.340
Unstable Areas and Floodplains
Section 845.340 Unstable Areas and Floodplains
a) An
existing or new CCR surface impoundment, or any lateral expansion of a CCR
surface impoundment, must not be located in an unstable area unless the owner
or operator demonstrates that recognized and generally accepted engineering
practices have been incorporated into the design of the CCR surface impoundment
to ensure that the integrity of the structural components of the CCR surface
impoundment will not be disrupted.
b) The
owner or operator must consider all the following factors, at a minimum, when
determining whether an area is unstable:
1) On-site
or local soil conditions, including liquefaction, that may result in
significant differential settling;
2) On-site
or local geologic or geomorphologic features; and
3) On-site
or local human-made features or events (both surface and subsurface).
c) An
existing or new CCR surface impoundment, or any lateral expansion of a CCR
surface impoundment, must not be located in a floodplain unless the owner or
operator demonstrates that recognized and generally accepted engineering
practices have been incorporated into the design of the CCR surface impoundment
to ensure that the CCR surface impoundment will not restrict the flow of the
base flood, reduce the temporary water storage capacity of a floodplain, or
result in washout of CCR, so as to pose a hazard to human life, wildlife, or
land or water resources. For purposes of this subsection (c):
1) Base
flood means a flood that has a 1 percent or greater chance of recurring in any
year or a flood of a magnitude equaled or exceeded once in 100 years on average
within the time of historical river level records.
2) Floodplain
means the lowland and relatively flat areas adjoining inland and coastal
waters, including flood-prone areas of offshore islands, which are inundated by
the base flood.
3) Washout
means the carrying away of CCR by waters of the base flood.
d) The
owner or operator of the CCR surface impoundment must obtain a certification
from a qualified professional engineer stating that the demonstration meets the
requirements of subsections (a) and (c).
e)
The owner or operator of an existing CCR surface impoundment
must complete the demonstration required by subsections (a) and (c) of this
Section and submit the completed demonstration, along with a qualified
professional engineer's certification, to the Agency with the facility's
initial operating permit application.
f)
The owner or operator of a new CCR surface impoundment, or
a lateral expansion of a CCR surface impoundment, must submit
plans and
specifications in a construction permit application that demonstrate the CCR
surface impoundment will be constructed under subsections (a) and (c). Upon
completion of construction, the owner or operator must obtain a certification
from a qualified professional engineer that the CCR surface impoundment or
lateral expansion was constructed in accordance with the requirements in
subsections (a) and (c) and submit the certification to the Agency in the
facility's initial operating permit application.