35 Ill. Adm. Code 845.710
Closure Alternatives
Section
845.710 Closure Alternatives
a) Closure
of a CCR surface impoundment, or any lateral expansion of a CCR surface
impoundment, must be completed either by leaving the CCR in place and
installing a final cover system or through removal of the CCR and
decontamination of the CCR surface impoundment, as described in Sections
845.720 through 845.760.
b) Before
selecting a closure method, the owner or operator of each CCR surface
impoundment must complete a closure alternatives analysis. The closure
alternatives analysis must examine the following for each closure alternative:
1) The
long- and short-term effectiveness and protectiveness of the closure method,
including identification and analyses of the following factors:
A) The magnitude of reduction of existing risks;
B) The
magnitude of residual risks in terms of likelihood of future releases of CCR;
C) The
type and degree of long-term management required, including monitoring,
operation, and maintenance;
D) The
short-term risks that might be posed to the community or the environment during
implementation of a closure, including potential threats to human health and
the environment associated with excavation, transportation, and re-disposal of
contaminants;
E) The
time until closure and post-closure care or the completion of groundwater
monitoring under Section 845.740(b) is completed;
F) The
potential for exposure of humans and environmental receptors to remaining
wastes, considering the potential threat to human health and the environment associated
with excavation, transportation, re-disposal, containment or changes in
groundwater flow;
G) The
long-term reliability of the engineering and institutional controls, including
an analysis of any off-site, nearby destabilizing activities; and
H) Potential
need for future corrective action of the closure alternative.
2) The
effectiveness of the closure method in controlling future releases based on
analyses of the following factors:
A) The
extent to which containment practices will reduce further releases; and
B) The
extent to which treatment technologies may be used.
3) The
ease or difficulty of implementing a potential closure method based on analyses
of the following types of factors:
A) Degree
of difficulty associated with constructing the technology;
B) Expected
operational reliability of the technologies;
C) Need
to coordinate with and obtain necessary approvals and permits from other
agencies;
D) Availability
of necessary equipment and specialists; and
E) Available
capacity and location of needed treatment, storage, and disposal services.
4) The
degree to which the concerns of the residents living within communities where
the CCR will be handled, transported and disposed of are addressed by the
closure method.
c) In
the closure alternatives analysis, the owner or operator of the CCR surface
impoundment must:
1) Analyze
complete removal of the CCR as one closure alternative, along with the modes
for transporting the removed CCR, including by rail, barge, low-polluting
trucks, or a combination of these transportation modes;
2) Identify
whether the facility has an onsite landfill with remaining capacity that can
legally accept CCR, and, if not, whether constructing an onsite landfill is
possible; and
3) Include
any other closure method in the alternatives analysis if requested by the
Agency.
d) The
analysis for each alternative completed under this Section must:
1) Meet
or exceed a class 4 estimate under
the
AACE Classification Standard, incorporated by reference
in
Section 845.150, or a comparable classification practice as provided in the
AACE Classification Standard;
2) Contain
the results of groundwater contaminant transport modeling and calculations
showing how the closure alternative will achieve compliance with the applicable
groundwater protection standards;
3) Include
a description of the fate and transport of contaminants with the closure
alternative over time, including consideration of seasonal variations; and
4) Assess
impacts to waters in the State.
e) At
least 30 days before submission of a construction permit application for
closure, the owner or operator of the CCR surface impoundment must discuss the
results of the closure alternatives analysis in a public meeting with
interested and affected parties (see Section 845.240).
f) After
completion of the public meeting under subsection (e), the owner or operator of
a CCR surface impoundment must select a closure method and submit a final
closure plan to the Agency under Section 845.720(b). All materials
demonstrating completion of the closure alternatives analysis specified in this
Section must be submitted with the final closure plan.
g) The
selected closure method must meet the requirements and standards of this Part,
ensure the protection of human health and the environment, and achieve
compliance with the groundwater protection standards in Section 845.600.