44 Ill. Adm. Code 1150.1300
Contract Negotiations
Section 1150
Section 1150.1300 Contract
Negotiations
a) The Department shall prepare a written description of the
scope of the proposed services, entitled "Scope of Work", to be used
as a basis for negotiations and shall negotiate a contract with the highest
ranked qualified Consultant at a compensation that the Department determines in
writing to be fair and reasonable. In making this decision, the Department
shall take into account the estimated value, scope, complexity, and
professional nature of the services to be rendered.
b) If the Department is unable to negotiate a satisfactory
contract with the Consultant that is most preferred, negotiations with that
Consultant will be terminated. The Department shall then begin negotiations
with the next ranked Consultant. If the Department is unable to negotiate a
satisfactory contract with that Consultant, negotiations with that Consultant
shall be terminated. The Department shall then begin negotiations with the
next ranked Consultant.
c) If the Department is unable to negotiate a satisfactory
contract with any of the selected Consultants, then the Department shall
re-evaluate the architectural, engineering, or land surveying services
requested, including the estimated value, scope, complexity, and fee
requirements. The Department shall then compile a second list of not less than
three qualified Consultants and proceed in accordance with the provisions of
this Subpart.
d) A Consultant negotiating a contract with the Department shall
negotiate any approved subcontracts for architectural, engineering, and land
surveying services at compensation that the Consultant determines in writing to
be fair and reasonable based upon a written description of the proposed
services of the subconsultant.