44 Ill. Adm. Code 950.210
Causes for Suspension, Debarment, Modification of Ability to Bid, or Conditional Prequalification
Section 950
Section 950.210 Causes for
Suspension,
Debarment, Modification of Ability to Bid, or Conditional
Prequalification
CDB may determine a contractor
is not responsible and suspend, debar or otherwise modify or issue a
conditional prequalification based upon one or more of the following:
a) Failure to satisfactorily perform work on CDB contract(s),
private contract(s), or other governmental contracts. (See also Section
950.220.)
b) Breach of the terms of a CDB contract(s), private contract(s),
or other governmental contract(s). (See also Section 950.220.)
c) Making false or misleading statements, or failing to disclose
or update significant information in connection with CDB procedures or
documents, including but not limited to the contractor bidder responsibility
application.
d) Violation of civil or criminal federal or State statutes or
administrative rules and regulations. In the case of criminal violations,
indictment or filing of formal charges by information (complaint) shall
constitute adequate evidence for a determination of non-responsibility.
e) Financial instability which may be evidenced by bankruptcy,
failure to timely pay subcontractors, difficulty in obtaining acceptable
bonding, attempts to assign contract proceeds, or other indications of serious
business management deficiencies.
f) Failure to understand, accept or utilize CDB procedures and
standards, or abuse of CDB procedures and standards, which results in the
extraordinary expenditure of CDB resources.
g) Commission of embezzlement, theft, forgery, bribery,
falsification or destruction of records, making false statements, receiving
stolen property, or conduct indicating a lack of business integrity or business
honesty that seriously and directly affects the present responsibility of a
contractor.
h) Suspension, debarment, or limits on bidding contracts by any
other governmental body.
i) Excessive bid withdrawals on CDB projects.
j) Any other cause of so serious or compelling a nature that it
affects the responsibility of a contractor.