44 Ill. Adm. Code 650.150
Reconsideration and Appeal
Section 650
Section 650.150
Reconsideration and Appeal
a) If an applicant is denied ratings, a contractor has its
ratings revoked, a contractor has its ratings revised, or an applicant is
issued incorrect ratings on a Certificate of Eligibility, the applicant or
contractor may request reconsideration by notifying the Prequalification
Section by filing a written Request for Reconsideration within thirty days of
the issue date on the face of the Certificate or of the date on the
notification of denial or revocation.
b) A Request for Reconsideration shall clearly state the basis of
the request and be supported by information of the type required by this Part
which would indicate that the ratings should be amended or that the action of
the Prequalification Section should be modified or reversed.
c) The Engineer of Construction will review the Request for
Reconsideration and the applicant or contractor shall provide any additional
requested information for purposes of the review. The review will be completed
within 14 days after receipt unless the Engineer extends the time for review in
order to provide for a full and complete review. Upon completion of the
review, the Engineer of Construction shall notify the applicant of the results
and provide the applicant or contractor with an amended Certificate of
Eligibility or written confirmation of the previous determination or action
including an explanation of the reasons for the confirmation.
d) If the applicant or contractor remains unsatisfied with the
results of the Engineer of Construction review, the applicant or contractor may
file a written appeal to the Director within fourteen days of the date of the
Engineer of Construction final action.
e) The appeal shall state with specificity the basis of the
appeal and the reasons why the decision of the Engineer of Construction is
incorrect. No new issues may be raised. The appeal shall further state
whether the applicant or contractor requests an opportunity to make a verbal
presentation to the Director.
f) The Director will review all information submitted with the
appeal and will consider the verbal presentation of the applicant or
contractor. The appeals will be completed within 14 days after receipt unless
the Director extends the time in order to provide for a full and complete
review. The Director will notify the applicant or contractor of his decision
in writing and shall include an explanation of the reasons for the decision.
The decision of the Director shall be final.