44 Ill. Adm. Code 8.3050
Public Notice
Section 8.3050Â Public Notice
a)Â Â Â Â Â Â Â Â With
the exception of contracts with an estimated basic professional fee of less
than $25,000, whenever CDB requires the services of an A/E or land surveyor,
CDB shall submit to the CPO a notice of the need for services, also known as an
RFP, for publication in the Bulletin. In addition, CDB may publish a list of
projects whose contract values do not exceed $25,000. The CPO shall publish in
the Bulletin any notice that meets the requirements of this Part.
b)Â Â Â Â Â Â Â Â When
the services of a CM are required, CDB shall publish a request for proposals
setting forth the nature of the projects.
c)Â Â Â Â Â Â Â Â The
public notice shall include an abstract of the services required for each
project, a description of each project, and the required expertise of the A/E
or CM to be considered. The public notice shall also include the statement of
qualifications form to be completed for each project, as well as the date and
time by which submittal of the statement of qualifications will be accepted.
d)Â Â Â Â Â Â Â Â Notice
shall be posted
in
CDB's Procurement Bulletin and may be published in the
official State newspaper or otherwise made available in print.
CDB may also publish the notice in related construction
industry service publications.
e)Â Â Â Â Â Â Â Â In
addition to the other requirements of this Section, a request for proposal for
CM services will also be mailed to each vendor prequalified under Section 33-10
of the Code. When CDB establishes additional criteria for special projects under
44 Ill. Adm. Code 900.140 (Prequalification of Construction Managers), the
notice shall be published at least 30 days before the date the special
prequalification application or the statement of qualifications is due.
f)Â Â Â Â Â Â Â Â The
public notice shall be published at least 14 days prior to the date for
submittal of the statement of qualifications.
g)Â Â Â Â Â Â Â Â CM prequalification
standards may be revised to be more closely related to the needs or environment
of the special project, e.g., required vendor and/or personnel experience may
be limited to a particular size of project or to experience in a particular
environment, such as correctional facility work.