44 Ill. Adm. Code 8.3065
Submittal Requirements
Section 8.3065Â Submittal Requirements
a)Â Â Â Â Â Â Â Â A/E and CM
All A/Es submitting statements of
qualifications for a specific project shall be prequalified with CDB prior to
the date and time that the offers are due. All CMs submitting statements of qualifications
for a specific project shall be prequalified with CDB as CMs prior to the date
and time that the submittals are due. Failure to be prequalified will result
in rejection of the submittals.
b)Â Â Â Â Â Â Â Â In order to be
considered responsive, a submittal must include:
1)Â Â Â Â Â Â Â Â A
letter of interest that contains a statement of qualifications (CDB Form 255);
2)Â Â Â Â Â Â Â Â The
names of persons who will perform the services, including the designated staff
of any listed consultant, and their project assignments or duties;
3)Â Â Â Â Â Â Â Â If a statement of
qualifications is required:
A)Â Â Â Â Â Â Â the
names of persons who will perform the services, including the designated staff
of any listed consultant, and their project assignments or duties;
B)Â Â Â Â Â Â Â for
each person listed, a resume describing the person's experience and expertise
relevant to performance of the assignment;
4)Â Â Â Â Â Â Â Â A
summary of the vendor's history and experience that would demonstrate its
administrative ability to successfully carry out projects of the magnitude or
complexity of the offered project.
c)Â Â Â Â Â Â Â Â If
the offeror will use subcontractors to perform professional services, then the
following shall be required:
1)Â Â Â Â Â Â Â Â Those
subcontractors shall also be prequalified with CDB prior to the date and time
that the submittals are due, or the offer shall be rejected; and
2)Â Â Â Â Â Â Â Â The
offeror shall clearly indicate the anticipated percentage of the services that
will be performed by each listed subcontractor and identify whether each
consultant is certified as a MBE, FBE, VBE or SDVOB.
d)Â Â Â Â Â Â Â Â Failure
to comply with the requirements of this Section regarding subcontractors shall
result in rejection of the submittal.
e)Â Â Â Â Â Â Â Â If the offeror is a DB entity,
the following shall be required:
1)Â Â Â Â Â Â Â Â Proposals
must be properly identified and sealed.
2)Â Â Â Â Â Â Â Â Phase 1 proposals shall include a list of all
design professionals and other entities, as defined in Section 30-30 of the Code,
to which any work may be subcontracted during the performance of the contract.
3)Â Â Â Â Â Â Â Â Phase 1 proposals shall include a list of all
entities that will perform any of the 5 subdivisions of work defined in Section
30-30 of the Code.
4)Â Â Â Â Â Â Â Â Phase 2 proposals shall include a bid bond and
security in the format and amount designated in the RFPs.
5)Â Â Â Â Â Â Â Â Phase 2 proposals shall contain a separate
sealed envelope with the cost information.
6)Â Â Â Â Â Â Â Â The drawings and specifications of the proposal
shall remain the property of the DB entity.
7)Â Â Â Â Â Â Â Â Subject to approval by the CPO, proposals may be
withdrawn prior to evaluation for any cause. After evaluation begins by CDB, proposals
may only be withdrawn if there is clear and convincing evidence of material
error.