44 Ill. Adm. Code 8.8017
Special Projects
Section 8.8017 Special
Projects
a)Â Â Â Â Â Â Â Â When
CDB determines a construction project is so large or specialized that a special
prequalification and responsibility determination is appropriate, CDB may set
appropriate standards of acceptability different from those set out in this
Part. Other provisions of this Part shall remain applicable.
b)Â Â Â Â Â Â Â Â Special Prequalification
Provisions
1)Â Â Â Â Â Â Â Â A
public notice will be posted on the CDB Procurement Bulletin and may be
published in the CPO-GS Procurement Bulletin and/or in the official State
newspaper or may otherwise be made available in print describing the project
and any special prequalification requirements.
2)Â Â Â Â Â Â Â Â The
notice will be published at least 30 days before the date the special
prequalification application or the statement of qualifications is due.
3)Â Â Â Â Â Â Â Â Prequalification
standards may be revised to be more closely related to the needs or environment
of the special project (e.g., required vendor and or personnel experience may
be limited to a particular size of project, or to experience in a particular environment
such as correctional facility work).