44 Ill. Adm. Code 950.370
Effect on Current Contracts
Section 950
Section 950.370 Effect on
Current Contracts
Current CDB contracts may be
terminated when a contractor is determined to be non-responsible and it is in
the public interest to do so, whether or not the non-responsibility has a
direct connection with the current contract. Contracts may be terminated with
or without further action on the contractor's prequalification.