77 Ill. Adm. Code 205.1330
New Construction, Additions and Major Alterations
Section 205
Section 205.1330Â New
Construction, Additions and Major Alterations
Requirements and procedures for
new construction, additions, and major alterations are as follows:
a)Â Â Â Â Â Â Â Â Preliminary drawings and outline specifications, whether for
new construction or for substantial alterations, shall be submitted to the
Department with a program narrative description for review and approval prior
to starting final working drawings and specifications.
b)Â Â Â Â Â Â Â Â The final working drawings and specifications shall be
submitted to the Department for review and approval prior to release of contract
documents for bidding. Change orders that affect scope and/or function shall
be submitted for approval prior to execution.
c)Â Â Â Â Â Â Â Â The Department shall be notified of the award of contracts,
and when construction has been completed. Approval by the Department prior to
occupancy is required.
d)Â Â Â Â Â Â Â Â The preparation and submission of drawings and specifications
shall be executed by or be under the immediate supervision of an architect
registered in the State of Illinois. Structural drawings and specifications for
these systems may be executed by or be under the immediate supervision of a
structural engineer licensed in the State of Illinois. Mechanical and
electrical drawings and specifications for these systems may be executed by or
be under the immediate supervision of a professional engineer licensed in the
State of Illinois.
e)        First stage submission. Design Development Drawings and
Outline Specifications.
f)Â Â Â Â Â Â Â Â The preliminary sketch plans shall indicate in detail the
assignment of all spaces, size of areas and rooms, indicating in outline the
fixed and movable equipment and furniture.
1)Â Â Â Â Â Â Â Â The plans shall be drawn at a scale sufficiently large to
clearly present the proposed design.
2)Â Â Â Â Â Â Â Â The drawings shall include:
A)Â Â Â Â Â Â Â a plan of each floor including the basement or ground floor,
B)Â Â Â Â Â Â Â a plan showing roads, parking areas, sidewalks, etc.,
C)Â Â Â Â Â Â Â elevations of all facades,
D)Â Â Â Â Â Â Â sections through the building, and
E)Â Â Â Â Â Â Â all adjacent areas clearly labeled if addition or alteration.
3)Â Â Â Â Â Â Â Â The total gross floor area shall be shown on the drawings.
4)Â Â Â Â Â Â Â Â Outline specifications shall provide a general description of
the construction including finishes; acoustical material, its extent and type;
heating and ventilating systems; and the type of elevators.
5)Â Â Â Â Â Â Â Â A brief narrative of the proposed program shall be included.
g)        Second stage submission. Working Drawings and Specifications.
All working drawings shall be well prepared so that clean and
distinct prints may be obtained, shall be accurately dimensioned and shall
include all necessary explanatory notes, schedules and legends. Working
drawings shall be complete and adequate for contract purposes. Separate
drawings shall be prepared for each of the following branches of work:Â Architectural,
Structural, Mechanical, Electrical. They shall include or contain the
following:
1)Â Â Â Â Â Â Â Â Architectural Drawings.
A)Â Â Â Â Â Â Â Site plan showing all new topography, newly established levels
and grades, existing structures on the site (if any), new buildings and
structures, roadways, walks, and the extent of the areas to be landscaped. All
structures and improvements that are to be removed under the construction
contract shall be shown.
B)Â Â Â Â Â Â Â Plan of each floor.
C)Â Â Â Â Â Â Â Elevations of each facade.
D)Â Â Â Â Â Â Â Sections through building.
E)Â Â Â Â Â Â Â If elevators and dumbwaiters are provided, drawings are
required showing shaft details and dimensions, sizes of cab platforms and
doors, travel distances including elevation height of landings, pit sizes, and
machine rooms.
F)Â Â Â Â Â Â Â Â Special care areas and similar areas shall be detailed at a
scale to show the location, type, size and connection of all fixed and movable
equipment.
G)Â Â Â Â Â Â Â Schedule of finishes.
2)Â Â Â Â Â Â Â Â Structural Drawings.
A)Â Â Â Â Â Â Â Plans of foundations, floors, roofs and all intermediate levels
shall show a complete design with sizes, sections, and the relative location of
the various members. Schedule of beams, girders and columns.
B)Â Â Â Â Â Â Â Floor levels, column centers, and off-sets shall be dimensioned.
C)Â Â Â Â Â Â Â Special openings and pipe sleeves shall be dimensioned or
otherwise noted for easy reference.
D)Â Â Â Â Â Â Â Details of all special connections, assemblies and expansion
joints shall be given.
E)Â Â Â Â Â Â Â Notes on design data shall include the name of the governing
building code, values or allowable unit stresses, assumed live loads, including
wind loads, earthquake load, and soil bearing pressures.
3)        Mechanical Drawings. These drawings with specifications shall
show the complete heating, cooling and ventilation systems; plumbing, drainage,
stand pipe, and sprinkler systems.
A)Â Â Â Â Â Â Â Heating, Cooling and Ventilation.
i)Â Â Â Â Â Â Â Â Â Any radiators, coils and steam heated equipment, such as
sterilizers.
ii)Â Â Â Â Â Â Â Â Heating and steam mains and branches with pipe sizes.
iii)Â Â Â Â Â Â Â Diagram of heating and steam risers with pipe sizes.
iv)Â Â Â Â Â Â Â Sizes, types and heating surfaces of boilers, furnaces, with
stokers and oil burners, if any.
v)Â Â Â Â Â Â Â Â Pumps, tanks, boiler breeching and piping and boiler room
accessories.
vi)Â Â Â Â Â Â Â Air conditioning systems with required equipment, water and
refrigerant piping, and ducts.
vii)Â Â Â Â Â Â Supply and exhaust ventilating systems with connections and
piping.
viii)Â Â Â Â Â Air quantities for all room supply and exhaust ventilating
duct openings.
B)Â Â Â Â Â Â Â Plumbing, Drainage and Stand Pipe Systems.
i)Â Â Â Â Â Â Â Â Â Size and elevation of:Â street sewer, house sewer, house
drains, street water main and water service into the building.
ii)Â Â Â Â Â Â Â Â Location and size of soil, waste, and vent stacks with
connections to house drains, cleanouts, fixtures and equipment.
iii)Â Â Â Â Â Â Â Size and location of hot, cold and circulating mains,
branches, and risers from the service entrance, and tanks.
iv)Â Â Â Â Â Â Â Riser diagram of all plumbing stacks with vents, water risers
and fixture connections.
v)Â Â Â Â Â Â Â Â Any gas, oxygen and similar piped systems.
vi)Â Â Â Â Â Â Â Any stand pipe and sprinkler systems.
vii)Â Â Â Â Â Â All fixtures and equipment that require water and drain
connections.
4)        Electrical Drawings. Drawings shall show all electrical
wiring, outlets, and equipment that require electrical connections.
A)Â Â Â Â Â Â Â Electrical service entrance with switches and feeders to the
public service feeders, characteristics of the light and power current,
transformers and their connections if located in the building.
B)Â Â Â Â Â Â Â Location of main switchboard, power panels, light panels and
equipment. Feeder and conduit sizes shall be shown with schedule of feeder
breakers or switches.
C)Â Â Â Â Â Â Â Light outlets, receptacles, switches, power outlets, and
circuits.
D)Â Â Â Â Â Â Â Telephone layout showing service entrance, telephone
switchboard, strip boxes, telephone outlets and branch conduits as approved by
the telephone company. Where public telephones are used for
inter-communication, separate room and conduits for racks and automatic
switching equipment shall be provided as required by the telephone company.
E)Â Â Â Â Â Â Â Fire alarm system with stations, signal devices, control board
and wiring diagrams.
F)Â Â Â Â Â Â Â Â Emergency electrical system with outlets, transfer switch,
source of supply, feeders, and circuits as required by the approved program as
required under the electrical requirements of this Part.