77 Ill. Adm. Code 810.30
General Requirements
Section 810
Section 810.30Â General
Requirements
a)        Permits. Prior to the construction of a new youth camp, or
major alteration or major extension of an existing youth camp, a permit must be
obtained from the Department. There shall be no fee for this permit.
1)Â Â Â Â Â Â Â Â In addition to the application requirements in Section 6 of
the Act, applications submitted to the Illinois Department of Public Health
(Department) for permits shall contain the following information:
A)Â Â Â Â Â Â Â Identification of the youth camp involved and the person or
organization preparing the drawings and specifications.
B)Â Â Â Â Â Â Â A statement describing the scope of the work proposed and the
anticipated time schedule.
C)Â Â Â Â Â Â Â A dimensioned plot plan of the youth camp area showing location
of all structures and improvements.
D)Â Â Â Â Â Â Â Drawings and/or specifications for proposed buildings and
structures in sufficient detail to confirm structural soundness and compliance
with applicable regulations (see Section 810.110).
E)Â Â Â Â Â Â Â Detailed drawings and specifications of proposed potable water
source and/or distribution system construction and a general arrangement
drawing showing distances between components of the potable water system and
sources of potential contamination (see Section 810.40).
F)Â Â Â Â Â Â Â Â Detailed drawings and specifications of proposed sewage system
construction and a general arrangement drawing showing distances between
components of the sewage system and potable water systems or bodies of surface
water, data showing estimated volume of sewage flow, and soil percolation rates
for absorption fields. Where a permit is required from the Environmental
Protection Agency or a unit of local government for construction of a sewage
disposal system, a copy of the permit or permit application shall be submitted
(see Section 810.50).
G)Â Â Â Â Â Â Â Detailed drawings and specifications for proposed swimming pool
construction sealed by an engineer or architect licensed to practice in
Illinois, which indicate compliance with the Department's Swimming Facility
Code (see Section 810.80).
H)Â Â Â Â Â Â Â Detailed drawings and specifications for proposed bathing beach
construction showing water shed area, location of components of sewage systems
within the water shed, area and volume of the lake or pond, slope of the bottom
of the swimming area, extent of sand or gravel bottom in the swimming area,
height of diving boards, depth of water in swimming and diving areas, location
of buoyed lines marking wading and swimming areas, and proposed bather load
(see Section 810.80).
I)Â Â Â Â Â Â Â Â Detailed drawings and specifications for proposed recreational
equipment construction involving partial or total body contact in water (see
Section 810.80).
J)Â Â Â Â Â Â Â Â Detailed drawings and specifications for proposed food service
establishment construction showing interior construction of the building,
floors, walls, and ceilings as well as details of food handling equipment to be
installed (see Section 810.60).
K)Â Â Â Â Â Â Â Drawings of proposed electrical distribution system
construction showing general arrangement, size and type of wiring, grounding,
overcurrent protection, and design of receptacles (see Section 810.140).
L)Â Â Â Â Â Â Â Drawings of proposed sewer and water piping within buildings
showing size and location of piping, fittings, and fixtures as well as
materials of construction.
M)Â Â Â Â Â Â The period of operation of the youth camp and the maximum number
of children expected to occupy the youth camp at one time.
2)Â Â Â Â Â Â Â Â The plans shall be sealed by an engineer or architect licensed
to practice in Illinois if required by the Professional Engineering Practice Act
of 1989 or the Illinois Architecture Practice Act of 1989.
3)Â Â Â Â Â Â Â Â Prior to the issuance of a construction permit, the permit
applicant shall submit with the application a completed "Special Flood
Hazard Area Request Form" provided by the Department. If the site is
within a Special Flood Hazard Area, the applicant shall forward to the Illinois
Department of Transportation's Division of Water Resources the plans for the
project. No project to be located in a Special Flood Hazard Area shall be
issued a permit without a statement or a copy of a statement from the Division
of Water Resources that the construction complies with the requirements of
Executive Order 2006-5, dated March 7, 2006 (available at
https://www.illinois.gov/content/dam/soi/en/web/coronavirus/documents/execorder2006-5.pdf).Â
Construction of such items as water wells, septic tanks, underground utilities,
light poles, pavilions, playground equipment sidewalks and driveways as
specified in Statewide Permit Number 6 issued by the Illinois Department of
Transportation, Division of Water Resources, May 13, 1983 are exempt from the
above requirements.
4)Â Â Â Â Â Â Â Â A permit is not required to repair a facility in a licensed
youth camp or to correct a violation of this Part when such repair or
correction is made to an existing facility, and does not result in expansion of
any existing appurtenances or structures.
5)Â Â Â Â Â Â Â Â Permits for new youth camp construction or alteration, if
required, shall be obtained from local health departments, zoning boards, and
other governmental units having jurisdiction.
6)Â Â Â Â Â Â Â Â An extension to a youth camp less than a major extension shall
not require a permit. However, prior to initiating construction, the applicant
shall advise the Department in writing of the scope of the extension. This
shall be addressed to:Â Illinois Department of Public Health, Division of
Environmental Health, 525 West Jefferson, Springfield, Illinois 62761.
b)        Local Regulations. Nothing in this Part shall be construed as
authorizing exemptions from more stringent regulations imposed by any other
governmental agency having jurisdiction.
c)        Variance Procedure. The Department may grant a variance to a
specific regulation when the operator or owner of a youth camp submits a
request for such variance to the Department with drawings, specifications,
documents or calculations showing that the alternative methods or designs
proposed will provide equivalent protection to that which would prevail under
these rules. The capability of the proposed variance to ensure protection
equivalent to that provided by this Part shall be the basis for approval or
denial of a variance. The Department shall notify the applicant in writing of
its decision to either grant or deny the variance within 60 days of receipt of
the request. A variance shall be requested and approved before the proposed
activity can be implemented.
d)        Responsibility of Licensee. The licensee shall be responsible
for maintenance and operation of the youth camp in compliance with the Illinois
Youth Camp Act and this Part.
e)        Youth Camp Location. No permanent youth camp structure or
facility shall be located in an area subject to flooding or within 100 feet of
a body of stagnant water, highway, railroad track, or manufacturing area.
f)        Construction Without a Permit. Youth camps that were
constructed prior to July 1, 1986, and not licensed by the Department shall
provide prior to the issuance of a license the following information in
addition to the application requirements in Section 5 of the Act:
1)Â Â Â Â Â Â Â Â As-built plans showing an overall plan of the entire youth
camp, a floor plan of all existing buildings, the location of the utilities and
the capacity of the sewage and water systems.
2)Â Â Â Â Â Â Â Â The period of operation of the youth camp and the maximum
number of youths expected to occupy the youth camp at one time.