77 Ill. Adm. Code 820.500

General Prequalification Information

Last amended: 2013Year: 2026Length: 94 wordsOfficial source
Section 820 Section 820.500  General Prequalification Information Architects and professional engineers submitting permit applications and plans shall have been prequalified by the Department. Swimming facility contractors constructing a swimming facility shall have been prequalified by the Department. Prequalification is free of charge to the applicant. Each applicant for prequalification shall: a)         Ensure that the prequalification status is approved prior to submitting an application for a permit; b)         Notify the Department within 30 calendar days after any changes to information contained in the prequalification application. Failure to do so may result in loss of prequalification.
77 Ill. Adm. Code 820.500: General Prequalification Information | Justis AI