77 Ill. Adm. Code 845.295
Re-occupation of the Lead Work Area
Section 845.295Â Re-occupation of the Lead Work Area
a)Â Â Â Â Â Â Â Â Before
a work area may be released for re-occupancy, the work area must meet the
following requirements:
1)Â Â Â Â Â Â Â Â The
work area shall pass the visual inspection outlined in Section 845.225; and
2)Â Â Â Â Â Â Â Â Lead
dust levels on floors and other horizontal surfaces shall be below the levels
established in Section 845.205(c).
b)Â Â Â Â Â Â Â Â Upon
passing the visual inspection and achieving acceptable final  clearance evaluation
results, the licensed lead abatement contractor shall obtain a signed copy of
the final clearance evaluation results required by Section 845.225 before being
released from the work area.
c)Â Â Â Â Â Â Â Â Upon
receipt of the signed final clearance evaluation results required by Section 845.225,
the licensed lead abatement contractor shall remove the remaining isolation
barriers and may release the work area for re-occupancy.