77 Ill. Adm. Code 855.150
Project Designer Responsibilities
Section 855
Section 855.150Â Project
Designer Responsibilities
a)Â Â Â Â Â Â Â Â The Department shall prepare and maintain a list of licensed
project designers. The list shall be made available upon request and shall be
used to select a project designer.
1)Â Â Â Â Â Â Â Â All school asbestos abatement projects shall be designed by a
Department licensed project designer in accordance with the requirements of
this Section.
2)Â Â Â Â Â Â Â Â If a commercial or public building project is designed, the
design shall be completed by a Department licensed designer in accordance with
the requirements of this Section.
b)Â Â Â Â Â Â Â Â In accordance with 40 CFR 763, a licensed project designer
shall design response actions for the LEA.
c)Â Â Â Â Â Â Â Â The project designer shall plan the abatement project in
accordance with all federal and State rules governing such action (i.e., 40 CFR
61; 29 CFR 1910 and 1926 and this Part) and the response action recommendations
of the management plan, if a plan is utilized.
1)Â Â Â Â Â Â Â Â All such planning shall be undertaken in compliance with the
relevant provisions of the Illinois Architecture Practice Act of 1989 [225 ILCS
305], the Illinois Professional Engineering Practice Act of 1989 [225 ILCS
325], the Illinois Structural Engineering Act [225 ILCS 340] and the Illinois
School Code [105 ILCS 5].
2)Â Â Â Â Â Â Â Â A licensed Industrial Hygienist who is a licensed project
designer may act as an asbestos project designer when a project design only
applies to interior alterations of surface materials in an existing building
and does not result in life safety changes to the building or changes to the
electrical, heating, air conditioning, physical plant or associated piping.Â
Interior alterations of any public building which result in life safety or
structural changes of the building are subject to the requirements of the
Illinois Architecture Practice Act of 1989 [225 ILCS 305] and must be performed
under the direct supervision and control of an architect licensed under that
Act.
3)Â Â Â Â Â Â Â Â The project designer shall certify that the project design
meets or exceeds all federal, State, and local regulations and codes.
d)Â Â Â Â Â Â Â Â The project designer shall design or directly supervise
preparation of the specifications and plans for each individual project. These
contract documents shall include the designer's Department-issued license I.D.
number and handwritten signature.
1)Â Â Â Â Â Â Â Â Project design documents shall contain the following
information:
A)Â Â Â Â Â Â Â General location of the project within the facility.
B)Â Â Â Â Â Â Â Locations of mini-containments, if applicable.
C)Â Â Â Â Â Â Â Location of barriers.
D)Â Â Â Â Â Â Â Location of the worker decontamination enclosure system(s).
E)Â Â Â Â Â Â Â Location of equipment decontamination enclosure system(s).
F)Â Â Â Â Â Â Â Â Location where negative air machines are to exhaust.
2)Â Â Â Â Â Â Â Â Any and all changes to the design shall be verified by the
project designer and shall bear his or her Department-issued license I.D.
number and handwritten signature.
e)Â Â Â Â Â Â Â Â The abatement project designer shall be responsible for the
design specifications and plans prepared by him or her in accordance with
applicable laws and standard of care required of those providing professional
services.
f)Â Â Â Â Â Â Â Â Prior to and during project activities in school buildings,
the project designer shall submit to the Department any changes in the names
and addresses of any project manager and air sampling professional.