77 Ill. Adm. Code 855.220
Notification and Procedures for Abatement of Asbestos in Commercial and Public Buildings
Section 855
Section 855.220Â Â Â Â Â Â Â Â Â Notification
and Procedures for Abatement of Asbestos in Commercial and Public Buildings
The work procedures and controls
specified below shall be followed only for abatement of ACBM in commercial and
public buildings, except as indicated (Schools shall use procedures and
controls specified in Subpart E of this Part.):
a)Â Â Â Â Â Â Â Â Notification.
1)Â Â Â Â Â Â Â Â Notification of friable and nonfriable asbestos abatement
project activities ranging in size from 3 square feet/3 linear feet to 160
square feet/260 linear feet to be performed in commercial and public buildings,
except industrial buildings as defined in Section 855.20, shall be made to the
Department at least 2 working days before the initiation of abatement project
activities.
2)Â Â Â Â Â Â Â Â Notification to the Department is not required for asbestos
abatement project activities performed in industrial buildings as defined in
Section 855.20.
3)Â Â Â Â Â Â Â Â Any notification required by this subsection (a) shall be made
by the contractor or building owner on a form made available by the Department.
b)Â Â Â Â Â Â Â Â Emergency Abatement Operations.
1)Â Â Â Â Â Â Â Â Notification to the Department, as specified in subsection (a)
of this Section, is not required for emergency abatement operations, as defined
in Section 855.20 of this Part.
2)Â Â Â Â Â Â Â Â The contractor shall notify the Department by telephone or
telefax on the same business day that emergency operations are initiated. If
emergency operations are initiated after business hours, the contractor shall
notify the Department on the next business day.
A)Â Â Â Â Â Â Â Notification shall specify the location of the emergency
abatement operation; name of contractor, building owner or his/her
representative, and air sampling professional; reason why emergency operations
are necessary; description of asbestos containing material; abatement
techniques to be used; and estimated time of completion of the project.
B)Â Â Â Â Â Â Â Notification shall be made to the Asbestos Program, Division of
Environmental Health, Illinois Department of Public Health at (217)782-5830 or
(217)785-5897 (fax).
C)Â Â Â Â Â Â Â After completion of emergency abatement operations, a written
follow-up report shall be made to the Department using the Department's
asbestos abatement notification form.
c)Â Â Â Â Â Â Â Â Work Practices and Controls for all Commercial and Public
Buildings.
1)Â Â Â Â Â Â Â Â Removal of ACBM shall be conducted in accordance with NESHAP
regulations 40 CFR 61, Subpart M, and OSHA regulations 29 CFR 1926.1101.
2)Â Â Â Â Â Â Â Â Encapsulation or enclosure of ACBM shall be considered a Class
III operation and shall be performed using controls at least as stringent as
those found in 29 CFR 1926.1101(g)(9) for Class III asbestos work.
3)Â Â Â Â Â Â Â Â Repair and maintenance of friable ACBM shall be performed
using controls and work practices specified by 29 CFR 1101(g)(9) for Class III
asbestos work.
4)Â Â Â Â Â Â Â Â All ACBM may be temporarily stored at the work area until
completion of the abatement project. Temporarily stored ACBM shall meet the
waste storage requirements of NESHAP regulations at 40 CFR 61, Subpart M. At
the conclusion of the abatement project, all temporarily stored ACBM shall be
removed from the work area and transported to a regulated landfill location
approved for disposal of asbestos-containing waste.
d)Â Â Â Â Â Â Â Â Clearance Air Monitoring.
1)Â Â Â Â Â Â Â Â After the completion of the final clean and when all surfaces
in the critical barriers are dry, the contractor, the building owner or the
building owner's designee shall inspect the area inside the critical barriers
for visible residue. If the area is clear of residue, the contractor, the
building owner or the building owner's designee shall notify an air sampling
professional that the contained area is ready for clearance air monitoring.
2)Â Â Â Â Â Â Â Â Air sampling shall be conducted by an air sampling
professional. The air sampling professional is allowed to use PCM for
clearance air monitoring in public and commercial buildings in lieu of TEM.
3)Â Â Â Â Â Â Â Â Required Samples.
A)Â Â Â Â Â Â Â A minimum of 2 samples shall be taken for areas up to 1,000 sq.
ft.
B)Â Â Â Â Â Â Â A minimum of 5 samples shall be taken for areas larger than
1,000 sq. ft. but not exceeding 50,000 sq. ft.
C)Â Â Â Â Â Â Â One additional sample shall be taken for every 10,000 sq. ft.
exceeding 50,000 sq. ft.
4)Â Â Â Â Â Â Â Â Each sample result shall be less than or equal to 0.01 f/cc.Â
If the air sampling results indicate a concentration of airborne asbestos
fibers in excess of clearance criteria, the contractor shall reclean the
contained area. The contractor shall not be released until the contained area
meets clearance criteria.
5)Â Â Â Â Â Â Â Â The building owner shall give a copy of the test results to
the contractor and retain a copy for its records for three years.
c)Â Â Â Â Â Â Â Â An air sampling professional is not required to obtain a
license pursuant to Section 855.100(i) to conduct asbestos air sampling in
commercial and public buildings; however, an air sampling professional shall
meet the following qualifications prior to conducting asbestos air sampling in
commercial and public buildings:
1)Â Â Â Â Â Â Â Â Successfully complete a NIOSH #582 course "Sampling and
Evaluating Airborne Asbestos Dust" or a course equivalent in length and
content.
2)Â Â Â Â Â Â Â Â Possess a Bachelor's Degree in the life, environmental or
physical sciences or in engineering and written verification of 520 hours
on-site experience in general indoor air pollution sampling; or an Illinois
Industrial Hygienist License; or written verification of 2080 hours on-site
experience in air sampling for asbestos on abatement projects under the
supervision of a licensed Air Sampling Professional.