77 Ill. Adm. Code 870.220
Tiedown Installation Requirements
Section 870.220Â Â Tiedown Installation Requirements
a)Â Â Â Â Â Â Â Â Equipment.Â
All manufactured homes installed after July 1, 2005 must be installed with
equipment approved by the Department.
b)Â Â Â Â Â Â Â Â Ties
1)Â Â Â Â Â Â Â Â Cable,
strapping or other approved material shall be used for ties.
2)Â Â Â Â Â Â Â Â The
ties shall connect from an anchor to the closest I-beam beneath the home. Ties
shall not connect to steel outriggers, unless specifically stated in the home
manufacturer's installation instructions. The angle formed between the tie and
the ground shall be between 40 and 50 degrees. If this angle exceeds 50
degrees when the tie is connected to the nearest I-beam, a tie shall connect
from an anchor to both I-beams of the unit.
3)Â Â Â Â Â Â Â Â Ties
shall be evenly spaced on each side of the length of the home with a maximum
separation of 12 feet and with the end ties within 2 feet of each end.
4)Â Â Â Â Â Â Â Â If
steel strapping is used, it must be secured around the I-beam using an approved
connecting device. Straps shall go from the anchor to the top of I-beam unless
the home manufacturer's instructions indicate otherwise. Care shall be
exercised to ensure that minimum bending radius is adhered to, so that the
breaking strength of the strapping is not reduced.
5)Â Â Â Â Â Â Â Â The
ties shall be secured to the I-beam of the home so that they will not become
disconnected if the tension is loosened.
6)Â Â Â Â Â Â Â Â Ties
must terminate with a D-ring, bolt or other tensioning device that will not
lower the material strength below that stated in Section 870.200(a).
7)Â Â Â Â Â Â Â Â All
cable ends shall be secured with at least two utility bolt type clamps or other
fastening device.
c)Â Â Â Â Â Â Â Â Anchors
1)Â Â Â Â Â Â Â Â All
anchors must be installed to full depth as specified in the anchor
manufacturer's installation instructions.
2)Â Â Â Â Â Â Â Â Stabilizing
devices must be utilized when the load on the ground anchor is not applied in
line with the anchor. Provisions shall be made to minimize the deflection or
slicing through the soil by the anchor rod at ground level. The method of
restricting deflection may be the encasement of the top portion of the anchor
in a concrete collar or by the use of a stabilizer plate.
3)Â Â Â Â Â Â Â Â Ground
anchors installed in line with the load of the anchor must be a minimum of 48
inches in length.
d)Â Â Â Â Â Â Â Â Frost
Heave. The following measures shall be taken for the specific type of
installation in order to prevent frost heave, which can cause damage to a home:
1)Â Â Â Â Â Â Â Â If
the support system for the home does not extend below the frost depth but the
anchors do, the ties shall be adjusted (loosened slightly in the fall and
tightened in the spring) to compensate for the tension caused by the earth
movement.
2)Â Â Â Â Â Â Â Â If
the support system for the home extends below the frost depth but the anchoring
system does not, the ties shall be tightened in the fall and loosened slightly
in the spring.
3)Â Â Â Â Â Â Â Â If
the anchoring system and the support system for the home both extend below the
frost depth or neither extends below the frost depth, no provisions for frost
heave are necessary.
e)Â Â Â Â Â Â Â Â Permanent
Foundation. Homes installed on a permanent foundation as defined in Section
870.10 are exempted from this Part.