77 Ill. Adm. Code 900.35
Revised Total Coliform Rule for Non-Community Public Water Systems
Section 900.35Â Revised Total Coliform Rule for
Non-Community Public Water Systems
a)Â Â Â Â Â Â Â Â Sanitary
Surveys
1)Â Â Â Â Â Â Â Â A
biennial sanitary survey shall be obtained by all non-community public water
systems that are not recreational facilities licensed by the Department.
2)Â Â Â Â Â Â Â Â All
non-community public water supplies licensed by the Department as recreational
facilities shall obtain an annual sanitary survey.
3)Â Â Â Â Â Â Â Â Special
Monitoring Evaluation
A)
To determine whether the system is on an
appropriate monitoring schedule, the Department will perform a special
monitoring evaluation during each sanitary survey. Â After the Department has
performed the special monitoring evaluation, it may modify the system's
monitoring schedule.
B)Â Â Â Â Â Â Â For
seasonal systems on quarterly or annual monitoring, the special monitoring
evaluation will include review of the approved sample siting plan, which must
designate the time period or periods for monitoring based on site-specific
considerations (e.g., during periods of highest demand or highest vulnerability
to contamination).
b)Â Â Â Â Â Â Â Â Monitoring
1)Â Â Â Â Â Â Â Â Routine
Monitoring
A)Â Â Â Â Â Â Â A
non-community water system supplier using only groundwater, excluding
groundwater under the direct influence of surface water, as defined in 35 Ill.
Adm. Code 611.102, and serving 1,000 persons or fewer must conduct the
following total coliform and E.coli monitoring:
i)Â Â Â Â Â Â Â Â Â Quarterly
Monitoring. Â The supplier must monitor each calendar quarter that the system
provides water to the public.
ii)Â Â Â Â Â Â Â Â Reduced
Monitoring. Â The Department may reduce the quarterly monitoring frequency to
not less than annually, if the most recent sanitary survey shows that the
system is free of sanitary defects, has a protected water source and the wells
conform to the requirements of the Water Well Construction Code.
B)Â Â Â Â Â Â Â Non-community
water systems that do not meet the requirements of subsection (b)(1)(A) are
subject to the monitoring requirements of 35 Ill Adm. Code 611.1056 and
611.1057 except vending machines classified as non-community water systems,
which must comply with (b)(1)(A).
C)Â Â Â Â Â Â Â Monitoring
after E. coli Violations
i)Â Â Â Â Â Â Â A
water system that incurs an E. coli violation, as specified in subsection
(h)(1), shall be placed on monthly monitoring for a minimum of one year
beginning in the next month in which the supplier
provides water to the public
, unless the cause of the violation has been
definitely determined by the Department and corrected prior to water being
served to the public.
ii)Â Â Â Â Â Â When
the cause of the violation has not been definitely determined by the Department
and corrected, monitoring must be conducted during the most vulnerable times
each month for the next 12 months following an E. coli MCL violation. Â If any
sample result (routine, repeat, additional routine, or clearance sample) is
Total Coliform Positive within 12 months following the MCL violation, the
system must collect monthly samples for a minimum of 12 consecutive months.Â
Monthly monitoring must begin in the next month in which the supplier provides
water to the public.
iii)Â Â Â Â Â After
12 consecutive months of monitoring, the Department may
allow
the water system to return
to quarterly monitoring in accordance with
subsection (b)(1)(A) if the water system meets the criteria specified in subsection
(b)(1)(E).
D)Â Â Â Â Â Â Â A
water system that incurs a coliform treatment technique violation, as specified
in subsection (h)(2), shall be placed on monthly monitoring for a minimum of
one year beginning in the next month in which the supplier provides water to
the public. After 12 consecutive months of monitoring, the Department may
allow the water system to return to quarterly monitoring in accordance with
subsection (b)(1)(A).
E)Â Â Â Â Â Â Â A supplier
may return to quarterly monitoring after being triggered to monthly monitoring
under subsection (b)(1)(C), once all of the following criteria are met:
i)Â Â Â Â Â Â Â Â Â The
system is free of sanitary defects, has a protected source, and the wells
conform to the requirements of the Water Well Construction Code;
ii)Â Â Â Â Â Â Â Â The
on-site assessment and all corrective actions specified by the Department have
been completed;
iii)Â Â Â Â Â Â Â The
system has conducted any increased monitoring required by the Department; and
iv)
The system is in compliance with cross-connection
requirements in
Section 900.40(l).
2)Â Â Â Â Â Â Â Â Repeat
Monitoring
A)Â Â Â Â Â Â Â If a
sample taken under subsection (b)(1) or (b)(4) is total coliform-positive, the
supplier must collect a set of repeat samples within 24 hours after being
notified of the positive result. The supplier must collect no fewer than three
repeat samples for each total coliform-positive sample found. The Department
will extend the 24- hour limit if the supplier has a logistical problem in
collecting the repeat samples within 24 hours that is beyond its control. The
Department will not waive the requirement for a supplier to collect the repeat
samples described in subsections (b)(2)(A) through (C).
B)Â Â Â Â Â Â Â The
supplier must collect all repeat samples on the same day, except the Department
will allow a supplier with a single service connection to collect the required
set of repeat samples over a three-day period or to collect a larger volume of
repeat samples in one or more sample containers of any size, as long as the
total volume collected is at least 300 milliliters.
C)Â Â Â Â Â Â Â The
supplier must collect an additional set of repeat samples in the manner
specified in subsections (b)(2)(A) through (C) if one or more repeat samples in
the current set of repeat samples is total coliform-positive. The supplier
must collect the additional set of repeat samples within 24 hours after being
notified of the positive result, unless the Department extends the limit as
provided in subsection (b)(2)(A). The supplier must continue to collect
additional sets of repeat samples until either total coliforms are not detected
in one complete set of repeat samples or the supplier determines that a
coliform treatment technique trigger specified in subsection (d) has been
exceeded as a result of a repeat sample being total coliform-positive and
notifies the Department. If a trigger identified in subsection (d) is exceeded
as a result of a routine sample being total coliform-positive, the supplier is
required to conduct only one round of repeat monitoring for each total
coliform-positive routine sample.
D)Â Â Â Â Â Â Â After
a supplier collects a routine sample and before it learns the results of the
analysis of that sample, if the supplier collects another routine sample from
within five adjacent service connections of the initial sample, and the initial
sample, after analysis, is found to contain total coliforms, then the supplier
may count the subsequent sample as a repeat sample instead of as a routine
sample.
E)Â Â Â Â Â Â Â Results
of all routine and repeat samples taken under subsection (b) not invalidated by
the Department must be used to determine whether a coliform treatment technique
trigger specified in subsection (d) has been exceeded.
3)Â Â Â Â Â Â Â Â Escherichia
coli (E. coli) Testing
A)Â Â Â Â Â Â Â If any
routine or repeat sample is total coliform-positive, the supplier's certified
laboratory must analyze that total coliform-positive culture medium to
determine if E. coli are present. If E. coli are present, the supplier must
notify the Department by the end of the day when the supplier is notified of
the test result. If the supplier is notified of the result after the Department
office is closed and the Department does not have either an after-hours phone
line or an alternative notification procedure, the supplier must notify the
Department before the end of the next business day.
B)Â Â Â Â Â Â Â The
Department will allow a supplier to forego E. coli testing on a total
coliform-positive sample if that supplier assumes that the total
coliform-positive sample is E. coli-positive. Accordingly, the supplier must
notify the Department as specified in subsection (b)(3)(A) and must notify the
public in accordance with 35 Ill. Adm. Code 611.Subpart V.
4)Â Â Â Â Â Â Â Â Additional
Routine Monitoring the Month Following a Total Coliform-Positive Sample
A)Â Â Â Â Â Â Â Except
as provided in subsection (b)(4)(D), a supplier conducting monitoring pursuant
to subsection (b)(1)(A) must collect at least three routine samples during the
month following a total coliform-positive sample.
B)Â Â Â Â Â Â Â The
supplier shall either collect samples at regular time intervals throughout the
month or shall collect all required routine samples on a single day if samples
are taken from different sites.
C)Â Â Â Â Â Â Â The
supplier must use the results of additional routine samples in coliform
treatment technique trigger calculations under subsection (d).
D)Â Â Â Â Â Â Â Waiver.Â
Except as provided in subsection (b)(4)(F), the Department will waive the
requirement to collect three routine samples
the next
month in which the supplier provides water to the public
if:
i)Â Â Â Â Â Â Â Â Â The
Department performs a site visit before the end of the next month in which the
supplier provides water to the public. Although a sanitary survey is not
required, the site visit must be sufficiently detailed to allow the Department
to determine whether additional monitoring or any corrective action is needed;
ii)Â Â Â Â Â Â Â Â The
Department determines why the sample was total coliform-positive and
establishes that the supplier has corrected the problem or will correct the
problem before the end of the next month in which the supplier serves water to
the public; or
iii)Â Â Â Â Â Â Â The
Department determines that the supplier has corrected the contamination problem
before the supplier takes the set of repeat samples required in subsection
(b)(2) and all repeat samples were total coliform-negative.
E)Â Â Â Â Â Â Â The
Department must document any decision to waive the additional monitoring
requirements in writing, have it approved and signed by the supervisor of the
Department official who recommends that decision, and make this document
available to USEPA and the public. The written documentation must describe the
specific cause of the total coliform-positive sample and what action the
supplier has taken or will take to correct this problem.
F)Â Â Â Â Â Â Â Â Any
supplier that fails to collect all required repeat samples following any total coliform-positive
sample must collect three routine samples the next month in which the supplier
provides water to the public.
5)Â Â Â Â Â Â Â Â Sample
Siting Plans. A supplier must develop a written sample siting plan that
identifies sampling sites and a sample collection schedule that are
representative of water throughout the distribution system. These plans are
subject to Department review and revision. The supplier must collect total
coliform samples according to the sample siting plan. Routine and repeat
sample sites and any raw water sampling sites necessary to conduct triggered
source water monitoring must be reflected in the sampling plan.
c)Â Â Â Â Â Â Â Â All
seasonal non-community public water system suppliers must demonstrate
completion of a Department-approved start-up procedure, which shall include a
requirement for startup sampling to demonstrate coliform bacteria is not
present prior to serving water to the public. This demonstration must be
certified by the supplier on a form provided by the Department and submitted to
the Department prior to serving water to the public. This requirement may be
waived for seasonal systems if the entire distribution system remains
pressurized during the entire period that the system is not operating. In
addition to the start-up sampling, seasonal systems must have an approved
sample siting plan that designates the time period for monitoring based on site-specific
considerations (e.g., during periods of highest demand or highest vulnerability
to contamination). Seasonal suppliers must collect compliance samples during
this time period.
d)Â Â Â Â Â Â Â Â Coliform
Treatment Technique Triggers. A supplier must conduct assessments in
accordance with subsection (e) after exceeding treatment technique triggers in
subsection (d)(1) or (d)(2).
1)Â Â Â Â Â Â Â Â Monitoring Assessment Triggers
A)Â Â Â Â Â Â Â The
supplier fails to take a routine sample as required in subsection (b)(1)(A).
B)Â Â Â Â Â Â Â The
supplier fails to take every required repeat sample after any single total
coliform-positive sample, as required in subsection (b)(2).
C)Â Â Â Â Â Â Â The supplier
fails to take additional routine monitoring samples as required in subsection
(b)(4).
2)Â Â Â Â Â Â Â Â On-site
Assessment Triggers
A)Â Â Â Â Â Â Â An E.
coli MCL violation, as specified in subsection (h)(1).
B)Â Â Â Â Â Â Â A
system has two or more total coliform-positive samples in the same month.
e)Â Â Â Â Â Â Â Â Requirements
for Assessments
1)Â Â Â Â Â Â Â Â A
supplier must ensure that monitoring assessments are conducted in order to
identify the cause of the monitoring violation and to institute procedures to
prevent future monitoring violations.
2)Â Â Â Â Â Â Â Â A
supplier must ensure that on-site assessments are conducted in order to
identify the possible presence of sanitary defects and defects in distribution
system coliform monitoring practices. On-site assessments must be conducted by
the Department or parties approved by the Department.
3)Â Â Â Â Â Â Â Â When
conducting on-site assessments, the supplier must ensure that the assessor
evaluates minimum elements that include review and identification of
inadequacies in sample sites; sampling protocol; sample processing; atypical
events that could affect distributed water quality or indicate that distributed
water quality was impaired; changes in distribution system maintenance and
operation that could affect distributed water quality (including water
storage); source and treatment considerations that bear on distributed water
quality, where appropriate (e.g., small ground water systems); and existing
water quality monitoring data. The supplier must conduct the assessment
consistent with specific assessment elements with respect to the size and type
of the system and the size, type, and characteristics of the distribution
system.
4)Â Â Â Â Â Â Â Â Monitoring
Assessments. A supplier shall obtain a monitoring assessment if the water
system exceeds one of the treatment technique triggers in subsection (d)(1).
A)Â Â Â Â Â Â Â The
supplier must complete a monitoring assessment as soon as practical after any
trigger in subsection (d)(1). In the completed assessment form, the supplier
must describe corrective actions completed, and a proposed timetable for any
corrective actions not already completed. The supplier must submit the
completed monitoring assessment form to the Department within 30 days after the
supplier learns that it has exceeded a trigger.
B)Â Â Â Â Â Â Â If the
Department reviews the completed monitoring assessment and determines that the
assessment is not sufficient (including any proposed timetable for any
corrective actions not already completed), the Department must consult with the
supplier. If the Department requires revisions after consultation, the
supplier must submit a revised assessment form to the Department on an
agreed-upon schedule not to exceed 30 days after the date of the consultation.
C)Â Â Â Â Â Â Â Upon
completion and submission of the assessment form by the supplier, the
Department must determine if the supplier has identified a likely cause for the
monitoring assessment trigger and, if so, establish that the supplier has
corrected the problem, or has included a schedule acceptable to the Department
for correcting the problem.
D)Â Â Â Â Â Â Â Monitoring
assessments must include submittal of replacement samples for all missed
samples that caused a monitoring assessment trigger to be exceeded.
E)Â Â Â Â Â Â Â Monitoring
Assessments do not require an on-site visit and may be conducted by telephone
or electronic correspondence.
5)Â Â Â Â Â Â Â Â On-site
Assessments. A supplier shall obtain an on-site assessment if the water system
exceeds one of the treatment technique triggers in subsection (d)(2). The
supplier must comply with any expedited actions or additional actions required
by the Department in the case of an E. coli MCL violation.
A)Â Â Â Â Â Â Â The
supplier must ensure that an on-site assessment is completed by the Department
or by a third party approved by the Department as soon as practical after any
trigger in subsection (d)(2). The supplier must submit a completed on-site
assessment form to the Department within 30 days after the supplier learns that
it has exceeded a trigger. The assessment form must describe sanitary defects
detected, corrective actions completed, and a proposed timetable for any
corrective actions not already completed. The assessment form may also note
that no sanitary defects were identified.
B)Â Â Â Â Â Â Â If the
Department reviews the completed on-site assessment and determines that the
assessment is not sufficient (including any proposed timetable for any
corrective actions not already completed), the Department must consult with the
supplier. If the Department requires revisions after consultation, the
supplier must submit a revised assessment form to the Department on an
agreed-upon schedule not to exceed 30 days.
C)Â Â Â Â Â Â Â Upon
completion and submission of the assessment form by the supplier, the
Department must determine if a definitive cause for the on-site trigger has
been identified and determine whether the supplier has corrected the problem or
has included a schedule acceptable to the Department for correcting the
problem.
D)Â Â Â Â Â Â Â On-site
assessments must include clearance samples and submittal of replacement samples
for all missed routine, repeat and additional routine samples.
f)Â Â Â Â Â Â Â Â Corrective
Action. A supplier must correct sanitary defects found through either
monitoring or on-site assessments conducted under subsection (e). For
corrections not completed by the time of submission of the assessment form, the
supplier must complete the corrective actions in compliance with a timetable
approved by the Department in consultation with the supplier. The supplier
must notify the Department when each scheduled corrective action is completed.
g)Â Â Â Â Â Â Â Â Consultation.Â
At any time during the assessment or corrective action phase, either the
supplier or the Department may request a consultation with the other party to
determine the appropriate actions to be taken. The supplier may consult with
the Department on all relevant information that may impact on its ability to
comply with a requirement of this Section, including the method of
accomplishment, an appropriate timeframe, and other relevant information.
h)Â Â Â Â Â Â Â Â Violations
1)Â Â Â Â Â Â Â Â E.
coli MCL Violations. A supplier is in violation of the MCL for E. coli when
any of the conditions identified in this subsection (h)(1) occur.
A)Â Â Â Â Â Â Â The
supplier has an E. coli-positive repeat sample following a total
coliform-positive routine sample.
B)Â Â Â Â Â Â Â The
supplier has a total coliform-positive repeat sample following an E.
coli-positive routine sample.
C)Â Â Â Â Â Â Â The
supplier fails to take all required repeat samples following an E.
coli-positive routine sample.
D)Â Â Â Â Â Â Â The
supplier fails to test for E. coli when any repeat sample tests positive for
total coliform.
2)Â Â Â Â Â Â Â Â Treatment
Technique Violation
A)Â Â Â Â Â Â Â A
treatment technique violation occurs when a supplier exceeds a treatment
technique trigger specified in subsection (d) and then fails to complete the
required assessment or corrective actions, including the collection of all
required samples in accordance with subsections (d)(1) and (d)(2), within the
timeframe specified in subsections (e) and (f).
B)Â Â Â Â Â Â Â A
treatment technique violation occurs when a seasonal supplier fails to complete
a Department-approved start-up procedure prior to serving water to the public.
3)Â Â Â Â Â Â Â Â Monitoring
Violations
A)Â Â Â Â Â Â Â Failure
to take every required routine or additional routine sample in a compliance
period is a monitoring violation.
B)Â Â Â Â Â Â Â Failure
to analyze for E. coli following a total coliform-positive routine sample is a
monitoring violation.
4)Â Â Â Â Â Â Â Â Reporting Violations
A)Â Â Â Â Â Â Â Failure
to submit a monitoring report or completed assessment form after a supplier
properly conducts monitoring or assessment in a timely manner is a reporting
violation.
B)Â Â Â Â Â Â Â Failure
to notify the Department following an E. coli-positive sample as required by
subsection (b)(3)(A) in a timely manner is a reporting violation.
C)Â Â Â Â Â Â Â Failure
to submit certification of completion of Department-approved start-up procedure
by a seasonal supplier is a reporting violation.
i)Â Â Â Â Â Â Â Â Â Reporting
1)Â Â Â Â Â Â Â Â E. coli
A)Â Â Â Â Â Â Â A
supplier must notify the Department by the end of the day when the system
learns of an E. coli MCL violation. If the supplier learns of the violation
after the Department office is closed and the Department does not have either
an after-hours phone line or an alternative notification procedure, the
supplier must notify the Department before the end of the next business day.Â
The supplier must also notify the public in accordance with 35 Ill. Adm. Code 611.Subpart
V.
B)Â Â Â Â Â Â Â A
supplier must notify the Department by the end of the day when the supplier is
notified of an E. coli-positive routine sample. If the supplier is notified of
the result after the Department office is closed and the Department does not
have either an after-hours phone line or an alternative notification procedure,
the supplier must notify the Department before the end of the next business
day.
2)Â Â Â Â Â Â Â Â A
supplier that has violated the treatment technique for coliforms in subsections
(e) and (f) must report the violation to the Department no later than the end
of the next business day after it learns of the violation and must notify the
public in accordance with
35 Ill. Adm. Code 611.Subpart
V.
3)Â Â Â Â Â Â Â Â A
supplier required to conduct an assessment under subsection (e) must submit the
assessment report within 30 days. The supplier must notify the Department in
accordance with subsection (f) when each scheduled corrective action is completed
for corrections not completed by the time of submission of the assessment form.
4)Â Â Â Â Â Â Â Â A
supplier that has failed to comply with a coliform monitoring requirement must
report the monitoring violation to the Department within 10 days after the
supplier discovers the violation and must notify the public in accordance with
35 Ill. Adm. Code 611.Subpart V.
5)Â Â Â Â Â Â Â Â A
seasonal supplier must certify, prior to serving water to the public, that it
has complied with the Department-approved start-up procedure.
j)Â Â Â Â Â Â Â Â Â Recordkeeping
1)Â Â Â Â Â Â Â Â The
supplier must maintain all assessment forms, and documentation of corrective
actions completed as a result of those assessments, or other available summary
documentation of the sanitary defects and corrective actions taken under
subsections (e) and (f) for Department review. This record must be maintained
by the supplier for a period not less than five years after completion of the
assessment or corrective action.
2)Â Â Â Â Â Â Â Â The
supplier must maintain a record of any repeat sample taken that meets
Department criteria for an extension of the 24-hour period for collecting
repeat samples as provided for under subsection (b)(2)(A).