77 Ill. Adm. Code 905.APPENDIX
A Illustrations and Exhibits
Section 905.APPENDIX AÂ Â Illustrations and Exhibits
Section 905.ILLUSTRATION GÂ Â Instructions for Conducting
Percolation Tests
Percolation tests shall not be made in frozen ground or
ground that has been filled in the preceding 12 months. Percolation tests shall
be performed in accordance with the following procedures:
1.        Number
and Location of Percolation Tests. Select an area where the seepage field will
be located. Â When digging the holes, avoid animal burrows, large root channels,
etc. At least 3 separate percolation tests shall be performed at the site of
each proposed disposal area. The percolation test holes shall be at least 50
feet apart. At least one hole shall be located at the lowest elevation of the
proposed absorption field area. The 2 holes with the highest results shall be
used to determine percolation rate.
2.        Depth
of Percolation Test Hole. Dig or bore the holes with horizontal dimensions
approximately 4 to 6 inches in diameter to the depth of the proposed seepage field
or seepage bed.
3.        Preparation of Test
Hole.
a)Â Â Â Â Â Â Â Â Carefully
pick the bottom and sides of the hole with a knife blade or sharp pointed
instrument to remove smeared or smoothed soil and to provide a natural soil
interface into which water may percolate.
b)Â Â Â Â Â Â Â Â Remove all loose
material from the hole.
c)Â Â Â Â Â Â Â Â Add 2
inches of coarse gravel to protect the bottom from scouring and sediment. A
removable hardware cloth screen to line the lower part of the hole also helps
prevent sloughing of the hole sides during testing.
4.        Saturation
and Swelling of Soil: It is important to distinguish between saturation and swelling.
 Saturation means the void spaces between soil particles are full of water.Â
This can be accomplished in a very short period of time. Swelling is caused by
the intrusion of water into the individual soil particle. This is a slow
process, especially in a clay type soil and is the reason for requiring a
prolonged soaking period.
a)Â Â Â Â Â Â Â Â On
the day prior to conducting the percolation test, carefully fill the hole with
water and keep it full for at least 4 hours. The percolation test shall be
conducted on the day following this presoaking at least 18 hours after
presoaking is completed but prior to 30 hours after presoaking is completed.Â
Cover the hole during this 18-30 hour waiting period. In sandy soils with
greater than 70% sand and less than 15% clay (sand and loamy sand), after the 4
hour presoak, a percolation test may be attempted without the 18 hour waiting
period. If the percolation test results are greater than 45 minutes for a 6
inch drop in water, the test must be repeated after the 18 hour waiting
period. If the percolation test results are 45 minutes or less, the
percolation rate shall be used to size the system.
b)Â Â Â Â Â Â Â Â On
the day of conducting the percolation test, carefully fill the hole with water
to 12 inches above the gravel.
c)Â Â Â Â Â Â Â Â Allow
the water level to drop to a point 6 inches above the gravel. If the water
does not fall from 12 inches to 6 inches in 6 hours, the percolation test is
terminated and an alternate system is required.
d)Â Â Â Â Â Â Â Â Measure
the last 6 inch drop in water level at thirty minute intervals until all the
water has seeped away. Warning: Under no conditions shall measurements be
taken from water filled to the top of the hole or on water 12 inches deep in
the hole. Such results are completely invalid and will not be accepted.Â
Results from the last 6 inches of drop in water are the only results that will be
accepted.
5.        Recording
of Results. Record results of all tests as the total minutes required for the
last 6 inches of seepage. If the last 6 inches of water has not seeped away at
the end of 6 hours, the soil must be considered unsuitable for seepage field
disposal and the appropriate statement marked on the results form. If there is
more than a 30 minute difference between the highest 2 percolation tests, use
the larger result or perform additional percolation tests.
6.        Calculating
the Percolation Rate. Add the total minutes required for the last 6 inches of
water to fall from the 2 holes with the highest result and divide by 2. If the
average is less than 60 minutes, use the percolation rate of 60 minutes. If the
average is greater than 60 minutes, refer to Section 905.Appendix A:
Illustration H of this Part. Locate in the first column (Time (minutes)
required for last 6 inches of water to fall) where the highest 2 hole average
fits and use the next highest result as the percolation rate for sizing and
design. An example of this procedure is as follows: If 3 percolation tests
are conducted with results of 120 minutes, 140 minutes, and 155 minutes, the
highest 2 hole average would be (140 + 155)/2 or 147.5 minutes. Looking at
Section 905.Appendix A:Â Illustration H of this Part, the next highest result
would be 150 minutes. The 150 minute rate would be used to size and design the
subsurface seepage system.
7.        Distribution
of Results. The results of the percolation tests shall be given to the
homeowner and shall be retained by the contractor for at least 5 years. The
percolation test data report shall be returned to the appropriate regional
office or local authority.
TEST HOLE:
TEST HOLE #1
TEST HOLE #2
TEST HOLE #3
READING #
TIME
(in min.)
WATER
LEVEL
(in inches)
TIME
(in min.)
WATER
LEVEL
(in inches)
TIME
(in min.)
WATER
LEVEL
(in inches)
1
0
0
0
2
30
30
30
3
60
60
60
4
90
90
90
5
120
120
120
6
150
150
150
7
180
180
180
8
210
210
210
9
240
240
240
10
270
270
270
11
300
300
300
12
330
330
330
13
360
360
360