77 Ill. Adm. Code 915.10
Applications
Section 915
Section 915.10Â Applications
a)Â Â Â Â Â Â Â Â An application for examination for registration as a licensed
water well contractor or water well pump installation contractor must be
received in the office of the Department of Public Health, Springfield,
Illinois, at least 45 days prior to the date of examination. Applications
shall be made on forms provided by the Department and shall include the
following information:
1)Â Â Â Â Â Â Â Â Name and address of the applicant;
2)Â Â Â Â Â Â Â Â Age of the applicant;
3)Â Â Â Â Â Â Â Â A statement that the applicant is a citizen of the United
States or has declared his or her intention to become a citizen of the United
States; and
4)Â Â Â Â Â Â Â Â Employment records, W-2s, copies of paychecks, or other
evidence that the applicant has been employed in water well construction or
water well pump installation for a minimum of 420 working days in a maximum of
two years.
b)Â Â Â Â Â Â Â Â A recent photograph shall be submitted with the application
form and be made a permanent record.
c)Â Â Â Â Â Â Â Â Affidavits from previous and current licensed contractor
employers shall accompany the application, indicating the dates that the
applicant was employed and the locations of previous jobs that the applicant
performed, and verifying that the applicant was engaged in water well or water
pump installation work and that he or she performed this work under the
supervision of a licensed contractor. Â Beginning July 1, 2014, an applicant for
a water well contractor license shall submit copies of at least 10 water well
construction reports that identify the applicant as the driller. To identify
himself or herself as the driller, the applicant, along with the licensed
driller performing the supervision, shall sign and date each of the water well
construction reports. An applicant for a water well pump installation
contractor license shall submit copies of at least 10 water well pump
installation reports that identify the applicant as the pump installer. To
identify himself or herself as the pump installer, the applicant, along with
the licensed pump installer performing supervision, shall sign and date the
water well construction report or the water well pump installation report. The
names and addresses of previous licensed contractor employers shall be
included. These affidavits shall be submitted with the application form and
become a permanent record.
d)Â Â Â Â Â Â Â Â Qualifications.Â
The Department will approve an application, provided the applicant has the
following qualifications:
1)
Is
at least 18 years of age;
2)
Is
a citizen of the United States or has declared his or her intention to become a
citizen of the United States;
3)
Possesses
good moral character
on the basis of documentation provided by the
applicant's employers' affidavits as required in subsection (c) of this
Section, and that the applicant has no criminal record as described in Section
915.110(g);
4)Â Â Â Â Â Â Â Â Has
the following experience as documented according to subsections (a)(4) and (d)
of this Section:
A)
An
applicant for a water well contractor's license shall have worked two years
under the supervision of a licensed water well contractor;
B)
An
applicant for a water well pump installation contractor's license shall have
worked two years under the supervision of a licensed water well pump
installation contractor;
C)
An
applicant for a water well and pump installation contractor's license shall
have worked two years for a licensed water well contractor and pump
installation contractor; and
5)
Has
paid the
required
fee
in accordance with Section 13 of the Act. Â (Section
9 of the Act)