77 Ill. Adm. Code 920.100
Finishing and Testing
Section 920
Section 920.100Â Finishing
and Testing
a)        Upper Terminal. The casing or riser pipe shall be terminated
at a height above finished ground surface consistent with proposed plans for a
pump house and pump installation but not less than 8 inches above finished
ground surface or 24 inches above maximum high water level where flooding
occurs. The well shall be capped watertight until pump installation is made.
b)        Disinfection. Only after the well has been effectively
cleaned of all remaining drilling mud and drill cuttings can the well be
disinfected. The well contractor shall be responsible for properly disinfecting
the well upon completion. Disinfection shall also be done after the pump
installation is completed. Sufficient chlorine shall be introduced to give a
dosage of 100 parts per million to the water in the well.
1)        Drilled Wells. The disinfection of drilled wells shall be
accomplished in accordance with the following:
DIAM. WELL IN INCHES
GALLONS PER FT.
AMOUNT OF
DISINFECTANT REQUIRED FOR EACH 100 GALLONS OF WATER
3
.37
LAUNDRY BLEACH (5.25% CHLORINE)
HYPOCHLORITE GRANULES (70% CHLORINE)
4
.65
5
1.0
6
1.5
8
2.6
10
4.1
3 cups
2 ounces
12
6.0
1 cup = 8
oz. measuring cup
(2 cups =
1pt.; 4 cups = 1 qt.)
1 oz. = 1
heaping tablespoon granules
(16 oz. =
1 lb.)
A)Â Â Â Â Â Â Â Determine the amount of water in the well by multiplying the
gallons per foot by the number of feet of water in the well.
B)Â Â Â Â Â Â Â For each 100 gallons of water in the well, use the amount of
chlorine liquid or compound given in the above tables. Mix this total amount
in about 10 gallons of water. If dry granules or tablets are used, they may
be added directly to drilled wells.
C)Â Â Â Â Â Â Â Pour this solution into the top of the well before the seal is
installed.
D)Â Â Â Â Â Â Â Connect one or more hoses from faucets on the discharge side of
the pressure tank to the top of the well casing and start the pump,
recirculating the water back into the well for at least 15 minutes. Then open
each faucet in the system until a chlorine smell appears. Close all faucets.Â
Seal the top of the well.
E)Â Â Â Â Â Â Â Let stand for several hours, preferably overnight.
F)Â Â Â Â Â Â Â Â After standing, operate the pump, discharging water from all
outlets until all chlorine odor disappears. Faucets on fixtures discharging
to septic tank systems should be throttled to a low flow to avoid overloading
the disposal system.
2)        Dug/Bored Wells. The disinfection of dug/bored wells shall be
accomplished in accordance with the following:
Diameter of well (in feet)
3
4
5
6
7
8
10
Amount of 5.25% laundry bleach
to use per foot of water (in cups)
1
½
3
4
½
6
9
12
18
Amount of 70% Hypochlorite
granules to use per foot of water (in ounces)
1
2
3
4
6
8
12
A)Â Â Â Â Â Â Â The amount of disinfectant required is determined primarily by
the amount of water in the well. The table above shows the amount of the
chlorine to use for each foot of water in the well, according to its diameter.
B)Â Â Â Â Â Â Â To determine the exact amount of bleach to use, multiply the
amount of disinfectant indicated as determined by the well's diameter times the
number of feet of water.
C)Â Â Â Â Â Â Â This total amount of bleach shall be added to approximately 10
gallons of water, and splashed around the lining, or wall of the well. Be
certain that the solution has contacted all parts of the well, using the entire
amount of disinfectant. Seal the top of the well.
D)Â Â Â Â Â Â Â When this is done, pump enough water so the strong chlorine
odor is evident. When the odor is detected, stop the pumping and allow the
solution to remain in the well overnight.
E)Â Â Â Â Â Â Â After standing, operate the pump, discharging water from all
outlets until all chlorine odor disappears. Faucets on fixtures discharging to
septic tank systems shall be throttled to a low flow to avoid overloading the
disposal system.
3)        Water Samples. Upon completion of a new well or modification
of an existing well, the contractor shall give the owner information prepared
by the Department explaining the importance of water well sampling, procedures
for sampling, and how the water can be tested to assure a safe supply of water.