77 Ill. Adm. Code 920.180
Closed Loop Wells
Section 920
Section 920.180Â Closed Loop
Wells
a)        Construction. For each closed loop well, the borehole,
containing the heat exchanger piping, shall be grouted from the bottom of the
borehole to the bottom of the header-piping trench and, in the case of
directional bores, the surface of the ground. Â When karst conditions are
encountered, disinfected clean pea gravel or limestone chips may be used to
bridge karst zones, limited to 5 feet above the karst zone. When more than one
karst zone is encountered a bentonite plug a minimum of 5 feet thick must be
installed above each karst zone. The Department will maintain a list of
approved closed loop well grouts on its website at http://www.dph.illinois.gov/.
Closed loop wells that are constructed in a manner that leaves a casing in the
ground shall be grouted in a manner consistent with water wells. Closed loop
wells shall not be located closer to water wells and sources of contamination
than the minimum separation distances specified in Table C.
b)Â Â Â Â Â Â Â Â Borehole
Piping. Piping shall be watertight with a minimum of 160 psi pressure-rated
high density polyethylene or equivalent manufactured for the purpose of use in
a ground heat exchange system. All copper piping and joints used in direct
expansion heat pump systems shall be watertight and conform to UL 1995.
c)Â Â Â Â Â Â Â Â Heat
Exchange Fluid. The heat exchange fluid that is pumped through the closed loop
well piping shall be compatible with piping in the borehole and shall be water
or a mixture of water and one of the following: methanol, or ethanol, or United
States Pharmacopeia propylene glycol that meet U.S. FDA Food Contact Substance
(FCS) Requirements.
d)Â Â Â Â Â Â Â Â Refrigerant.
When refrigerant is used with copper piping in a direct exchange system, the
refrigerant shall be R-134a or R-290.
e)Â Â Â Â Â Â Â Â Sealing
Requirements for Closed Loop Wells.
1)Â Â Â Â Â Â Â Â Heat
Exchange Fluid or Refrigerant. All heat exchange fluid or refrigerant shall be
removed from the closed loop well system and disposed of in accordance with
State and local laws.
2)Â Â Â Â Â Â Â Â Piping.Â
All piping left in place in closed loop wells shall be sealed with neat cement
grout or any bentonite product manufactured for water well sealing by pressure
grouting. The sealing material shall be pumped into the supply of the loop
until the sealing material is flowing out of the return of the loop.
3)Â Â Â Â Â Â Â Â Open
or cased wells shall be sealed according to Section 920.120.
4)Â Â Â Â Â Â Â Â Abandoned
closed loop wells shall be brought into compliance with this Section or sealed
within 30 days after abandonment.
5)Â Â Â Â Â Â Â Â Closed
loop wells constructed for thermal conductivity testing shall be incorporated
into a system or sealed within one year after borehole completion. The
Department will grant an extension of this time if the owner submits a written
request to the Department indicating the reasons for the request and an
estimate of the time in which the closed loop well will be either sealed or
used. The request for the extension shall be submitted not less than 11 months
nor more than 12 months after borehole completion.