77 Ill. Adm. Code 920.70
Drilled Well Construction in Consolidated Formations
Section 920
Section 920.70Â Drilled Well
Construction in Consolidated Formations
a)Â Â Â Â Â Â Â Â Drift
or Earth Cover Less Than 30 Feet in Thickness
1)Â Â Â Â Â Â Â Â The
well casing shall extend to a depth of at least 40 feet below finished ground
surface. The diameter of the drill hole shall be a minimum of 3 inches greater
than the outer
diameter of the casing
or coupling, whichever is
greater
.
The annular space shall be pressure grouted as provided for in
Section 920.90(h). If plastic casing is installed, it shall be installed in
accordance with Section 920.90(g). (See Illustration D.)
2)Â Â Â Â Â Â Â Â If a well is drilled to obtain water below the upper bedrock
formation, it shall comply with subsection (a)(1) and the well casing shall be
seated firmly in rock. When a liner is installed through the casing, the
annular space between the casing and the liner shall be pressure grouted in
accordance with Section 920.90(h). If the upper bedrock formation is a
water-bearing formation, the liner shall be installed in accordance with
Section 920.40(c).
b)Â Â Â Â Â Â Â Â Drift or Earth Cover Over 30 Feet in Thickness
1)Â Â Â Â Â Â Â Â When an oversized drill hole is constructed for the
installation of the casing and the annular space is to be grouted through a
tremie pipe installed in the annular space, the diameter of the drill hole
shall be a minimum of 3 inches greater than the outer diameter of the casing or
coupling, whichever is greater. After the casing is installed, the annular
space shall be grouted as provided for in Section 920.90(h). The annular space
shall be grouted from the bottom of the casing to ground level. The tremie
pipe shall be installed to the bottom of the annular space. No device shall be
installed to prevent the tremie pipe from being installed into the annular
space or to prevent the grout from filling the annular space. (See Illustration
E.)
2)Â Â Â Â Â Â Â Â When
grout is pumped into the annular space through the inside of the casing, the
diameter of the drill hole shall be a minimum of 2 inches greater than the
outer diameter of the casing or coupling, whichever is greater. The entire
length of casing shall be grouted as provided in
Section 920.90(h). If
plastic well casing is installed, it shall be installed as required in Section
920.90(g).
3)Â Â Â Â Â Â Â Â When the casing is installed by mechanically driving the casing,
an oversized hole shall be constructed to a depth of at least 10 but not more
than 20 feet to allow removal of the drive nipple and installation of a joint
of casing. While the casing is being driven, the bottom of the oversized hole
shall be filled with granulated bentonite or natural clay mixture. After the
casing is installed, either the annular space that exists around the well
casing shall be grouted as required in Section 920.90(h) or, when the diameter
of the oversized hole is a minimum of 3 inches greater than the outer diameter
of the casing or coupling, whichever is greater, the annular space that exists
around the well casing can be filled with bentonite or natural clay. (See
Illustration F.)
c)        Flowing Artesian Well. A well that is constructed in a
location where flowing artesian conditions are encountered or expected to occur
shall be grouted to protect the artesian aquifer, prevent erosion of overlying
geologic materials, and confine the flow to within the casing. Initial
drilling operations shall extend into but not through the formation confining
the water. The casing shall be installed and the annular opening between drill
hole and casing shall be pressure grouted in accordance with Section
920.90(h). If plastic casing is installed, it shall be installed in accordance
with Section 920.90(g). The hole shall then be extended into the artesian
formation. Flow control from the well shall be provided by valved pipe
connections, watertight pump connections, or receiving reservoirs set at an
altitude corresponding to the artesian head. Â The flowing well discharge
control shall be provided to conserve groundwater and to prevent the loss of
artesian head by preventing or reducing continuous discharges. A flow
discharge pipe, where installed, shall not be directly connected to a sewer or
other source of contamination.