77 Ill. Adm. Code 920.ILLUSTRATION E
E Creviced Formations: Earth Mantle Cover Over 30 Feet Thick – Oversized Drill Hole
Section 920.ILLUSTRATION EÂ Â Creviced
Formations: Earth Mantle Cover Over 30 Feet Thick – Oversized Drill Hole
1.  When a tremie pipe is used to grout, the diameter of the drill
hole must be at least 3" larger than the outer diameter of the casing or
coupling, whichever is greater.
2.  When grout is pumped through the inside of the casing, the
diameter of the bore hole must be at least 2" larger than the outer
casing or coupling, whichever is greater.
3.  The annular space must be grouted from the bottom of the casing to
ground level.