83 Ill. Adm. Code 1328.305
Wireless Carrier Testing
Section 1328.305 Wireless
Carrier Testing
a) No circuits associated with an authorized wireless 9-1-1
answering point shall be opened, grounded, short circuited or tested in any
manner until maintenance personnel have obtained release of the affected
circuits from the appropriate 9-1-1 authority. Wireless carrier maintenance
personnel shall advise the 9-1-1 authority regarding the length of time that
will be required to perform any work involving circuits associated with an
authorized wireless 9-1-1 answering point. Wireless carrier personnel shall notify
the 9-1-1 authority and the 9-1-1 system provider a minimum of 48 hours prior
to performing mobile office switching installations, NPA additions, NXX
additions, or any other scheduled event that affects 9-1-1.
b) Each wireless carrier shall adopt mutually agreed upon testing
practices, in conjunction with the 9-1-1 authority, to perform, at a minimum,
mobile office to PSAP 9-1-1 test calls when any of the following changes occur:
1) New mobile switching office installations;
2) NPA and NXX pANI additions;
3) Local number portability implementations;
4) Number pooling implementations; and
5) Any other event that affects 9-1-1.
c) Each wireless carrier shall develop a testing plan in
conjunction with the 9-1-1 system provider and the 9-1-1 authority for
inclusion in the 9-1-1 systems' wireless plan that must be submitted to the
Administrator.