83 Ill. Adm. Code 452.50
Emergency Exception
Section 452
Section 452.50 Emergency
Exception
a) In anticipation of impending emergencies and in times of
actual emergency affecting the public health and safety or electric system
integrity and reliability, electric utilities may take any actions necessary to
protect the public and the electric system. If under normal non-emergency
circumstances, those actions would constitute violations of this Part, the
utility shall file written reports as specified in this Section.
b) An electric utility shall file an initial written report with
the Commission within 24 hours after reliance on the authority in subsection
(a) notifying the Commission of such action.
c) Within 24 hours after notifying the Commission, the utility
shall notify non-affiliated ARES on the Internet site described in Section
452.80(d) of this Part.
d) Within seven days after initiating reliance on the authority
in subsection (a), or within two days after terminating reliance on the
authority in subsection (a), whichever is later, the electric utility shall
file a full written report with the Commission. The full written report shall
explain the nature and extent of the emergency, including how and why the
emergency arose. This report shall also list and describe each action the
electric utility took that, under normal non-emergency circumstances, would
constitute a violation of this Part. The initial and full written reports shall
be available to the public on an appropriate Internet site.