83 Ill. Adm. Code 460.380

Installation Inspections

Year: 2026Length: 42 wordsOfficial source
Section 460 Section 460.380  Installation Inspections Within 90 days after installation or exchange of any meter with associated instrument transformers and/or phase-shifting transformers, a post-installation inspection shall be made under load to determine if the meter is accurately measuring customer energy consumption.
83 Ill. Adm. Code 460.380: Installation Inspections | Justis AI