83 Ill. Adm. Code 467.20
Definitions and Incorporations by Reference
Section 467.20 Definitions and Incorporations by
Reference
Terms defined in Section 16-102 of the Public Utilities Act
[220 ILCS 5] shall have the same meaning for purposes of this Part as they have
under Section 16-102 of the Act, unless further defined in this Part. The
following words and terms, when used in this Part, have the following meanings
unless the context indicates otherwise:
"Act" means the Public
Utilities Act [220 ILCS 5].
"Adverse system impact"
means a negative effect that compromises the safety or reliability of the
electric distribution or transmission systems or materially affects the quality
of electric service provided by the electric distribution company (EDC) to
other customers.
"Affected system" means
an electric system, other than the EDC's distribution system with which the
distributed energy resources facility is to be directly connected, that could
suffer an adverse system impact from the proposed interconnection.
"Applicant" means a
person (or entity) who has submitted an interconnection request to interconnect
a distributed energy resources facility to an EDC's electric distribution
system.
"Business day" means
Monday through Friday, excluding State and federal holidays.
"Calendar day" means any
day, including Saturdays, Sundays and State and federal holidays.
"Certificate of completion"
means a certificate, in a form approved by the Commission, that contains
information about the interconnection equipment to be used, its installation
and local inspections (see Appendix A).
"Commissioning test"
means tests applied to a distributed energy resources facility by the applicant
after construction is completed to verify that the facility does not create
adverse system impacts and performs to the submitted specifications.
"Contingent upgrades"
means proposed interconnection facilities or distribution system upgrades,
identified during interconnection studies for an applicant’s interconnection
request, that are the responsibility of an interconnection request earlier in
the queue than the subject application for interconnection. The identified
contingent upgrades are required in order for the applicant’s proposed
interconnection request to receive permission to operate and, if delayed or not
built by the earlier-queued interconnection request, could cause a need for
restudies of the interconnection request and may become the responsibility of
the applicant’s interconnection request.
"Distributed energy resources
facility" or "DER facility" means the equipment used by an
interconnection customer to generate or store electricity that operates in
parallel with the electric distribution system. A DER facility may include, but
is not limited to, an electric generator or energy storage system, a prime
mover, and the interconnection equipment required to safely interconnect with
the electric distribution system or local electric power system.
"Electric distribution
company" or "EDC" means any electric utility subject to the
jurisdiction of the Commission.
"Electric distribution system"
means the facilities and equipment owned and operated by the EDC and used to
transmit electricity to ultimate usage points such as homes and industries from
interchanges with higher voltage transmission networks that transport bulk
power over longer distances. The voltage levels at which electric distribution
systems operate differ among areas, but generally operate at less than 100
kilovolts of electricity. "Electric distribution system" has the same
meaning as the term "Area EPS", as defined in Section 3.1.6.1 of IEEE
Standard 1547. "Electric distribution system" excludes facilities
under the operational control of the RTO.
"IEEE Standard 1547" is
the Institute of Electrical and Electronics Engineers, Inc., 3 Park Avenue, New
York NY 10016-5997, Standard 1547 (2003) "Standard for Interconnecting
Distributed Resources with Electric Power Systems". This incorporation
does not include any later amendments or editions.
"IEEE Standard 1547.1"
is the IEEE Standard 1547.1 (2005) "Conformance Test Procedures for
Equipment Interconnecting Distributed Resources with Electric Power Systems".
This incorporation does not include any later amendments or editions.
"Interconnection customer"
means a person or entity that has a DER facility interconnected, or that seeks
to interconnect, to an electric distribution system.
"Interconnection equipment"
means a group of components or an integrated system owned and operated by the
interconnection customer that connects an electric generator with a local
electric power system, as that term is defined in Section 3.1.6.2 of IEEE
Standard 1547, or with the electric distribution system. Interconnection
equipment is all interface equipment, including switchgear, protective devices,
inverters or other interface devices. Interconnection equipment may be
installed as part of an integrated equipment package that includes a generator
or other electric source.
"Interconnection facilities"
means facilities and equipment required by the EDC to accommodate the
interconnection of a DER facility. Collectively, interconnection facilities
include all facilities and equipment between the DER facility's interconnection
equipment and the point of interconnection, including any modifications or
additions necessary to physically and electrically interconnect the DER
facility to the electric distribution system. Interconnection facilities are
sole use facilities and do not include system upgrades.
"Interconnection request"
means an applicant's request, in a form approved by the Commission, for
interconnection of a new DER facility or to change the capacity or other operating
characteristics of an existing DER facility already interconnected with the
electric distribution system.
"Interconnection
study" is any study described in Section 467.70.
"Local electric power system"
means facilities that deliver electric power to a load that is contained
entirely within a single premises or group of premises. Local electric power
system has the same meaning as in Section 3.1.6.2 of IEEE Standard 1547.
"Nameplate capacity" is
the maximum rated output in kVA of a generator, prime mover, energy storage
system, or other electric power production equipment under specific conditions
designated by the manufacturer and usually indicated on a nameplate physically
attached to the power production equipment.
"Parallel operation" or "parallel"
means a DER facility that is connected electrically to the electric
distribution system for longer than 100 milliseconds.
"Point of interconnection"
or "POI" means the point where the DER facility is electrically
connected to the electric distribution system. Point of interconnection has the
same meaning as the term "point of common coupling" defined in
Section 3.1.13 of IEEE Standard 1547.
"Queue position" means
the order an EDC receives a completed interconnection request relative to that
specific EDC's other interconnection requests. It is established by the date
that the EDC receives the completed interconnection request.
"Scoping meeting" means
a meeting between representatives of the applicant and EDC conducted for the
purpose of discussing interconnection issues and exchanging relevant
information.
"Standard agreement for
interconnection of DER facilities with a capacity more than 10 MVA" means
a standard interconnection agreement applicable to interconnection requests for
large DER facilities (see Appendix C).
"Witness test" means a
verification by the EDC, either by on-site observation or review of documents,
that the interconnection installation evaluation required by the applicable
technical standards has been performed.