83 Ill. Adm. Code 501.230
Coriolis Meters
Section 501.230 Coriolis Meters
a) A
utility shall install a Coriolis meter in accordance with the recommendations
of AGA Report #11, Measurement of Natural Gas by Coriolis Meter, XQ1301 (February
2013).
b) A
utility shall verify the proper operation of an installed Coriolis meter at
least every 12 months by verifying that the meter meets the manufacturer's
tolerances using, at a minimum, all of the following inspection requirements:
1) Meter
zero flow check;
2) Meter
sensor check; and
3) Meter
transmitter check.
c) A
utility shall calibrate a Coriolis meter at least every 120 months. However, if
the utility can demonstrate that the meter meets the manufacturing tolerances
set forth in Section 501.220(b) and the utility conducts an annual inspection
of the meter body to ensure that the meter body has not incurred damage that
would affect the meter's accuracy, the utility may forego the 120-month
calibration requirement.
d) When
a utility removes a Coriolis meter from service, the utility shall verify the
meter's existing accuracy prior to altering the operation of the meter. This
verification replaces the requirements of Section 501.170(d) for Coriolis
meters.
e) A
utility shall maintain the most recent five years of inspection records. A utility
shall also maintain documents for each Coriolis meter's most recent accuracy
test, the prior accuracy test, and the dates of any other accuracy test that
occurred during the prior 10 years.