83 Ill. Adm. Code 501.260
Meter Tests Requested by the Customer
Section 501.260 Meter Tests Requested by the Customer
a) Upon
the request of a customer, if the utility or manufacturer has not tested the
meter within 12 months prior to the request, a utility furnishing metered gas
service shall, without charge, test the accuracy of a meter used to measure the
customer's gas consumption if either the meter's rated capacity is less than
16,000 cubic feet per hour or the meter's rated capacity is equal to or greater
than 16,000 cubic feet per hour and the test can be done without removing the
meter. If a customer so desires, a utility shall allow the customer or its
representatives to witness the meter test, whether conducted on the customer's
premises or at the utility's metering shop. The utility shall provide a written
summary of the results of the meter test to the customer within five business
days.
b) A
utility shall test a meter within 45 days after receiving a customer's request,
unless the customer agrees to a later time. The utility shall conduct the meter
test between 7 a.m. and 4 p.m. Monday through Friday, excluding holidays,
unless the utility and the customer agree to a different day or time.
c) If a
customer requests a test of a meter used to measure the customer's gas
consumption and the customer wishes to witness the test, but the utility's
testing facility is located out of state, the utility shall provide the option
of having the meter tested at an in-state testing facility, if that location is
more convenient for the customer, provided that the alternative location is in
good standing with the Commission. A meter shop is in good standing if a
Commission representative has conducted a review of the facility for compliance
with the requirements of this Part within the last 40 months and the meter shop
has no outstanding non‑compliance issues associated with its ability to
accurately measure meter accuracy. A Commission representative shall advise,
upon request by a utility, whether a meter shop is in good standing.
d) If a
customer requests an accuracy test of a meter used to measure the customer's
gas consumption, but the meter has a rated capacity equal to or greater than
16,000 cubic feet per hour and the requested test requires the physical removal
of the meter, then the customer shall pay to the utility the costs associated
with the test. A utility may not charge a customer more than $10,000 for the
test unless the utility must send the meter to a non-affiliated third party for
testing and, in that case, the utility may not charge a customer more than
$25,000 for the test. In the testing costs charged to the customer, a utility
may include meter removal and installation labor, costs associated with
transportation of the meter to and from a meter shop, shop testing labor,
transportation charges to send the meter to and from an outside testing
facility, and outside testing lab fees. If a meter over‑registers by more
than 2%, a utility shall reimburse a customer its payment of fees associated
with the meter test. A utility shall provide to its customer an itemized
written statement of the cost of a requested meter test, obtain the customer's
agreement to pay the stated cost, and receive payment from the customer for the
requested meter test before taking any action to remove the meter or begin the
requested meter test.
e) No
later than April 1 of each year, a utility shall provide a report to the
Director of the Safety and Reliability Division regarding the number of
customer-requested meter tests that the utility conducted in the prior calendar
year. The report shall list the meter size, meter type, test results, and
testing location for each meter tested.
f) A
utility shall waive the 12-month waiting period identified in subsection (a)
for customer-requested meter tests if a customer makes one of the following
demonstrations:
1) A
deviation in the customer's measured gas usage in excess of 10% occurred
following the utility's installation of a different meter on the customer's
service and the difference is not attributable to weather or the customer's
process changes; or
2) Relevant
facts that point to potential accuracy problems with the meter.