8 Ill. Adm. Code 255.180
On-farm Storage Facility Containment
Section 255
Section 255.180 On-farm
Storage Facility Containment
Notwithstanding the other
provisions of this Part, an on-farm storage facility shall comply with the
following:
a) All agrichemical non-mobile storage containers for liquid
pesticides and liquid fertilizer at an on-farm storage facility shall be
located within a secondary containment structure. Dry fertilizer or dry
pesticide materials shall be stored in a manner to prevent pollution by
minimizing losses to the air, surface water, underground water or subsoil. Dry
fertilizers and pesticides shall be stored inside a sound structure or device
having a cover or roofed top, sidewalls and base sufficient to prevent contact
with precipitation and surface waters.
b) Registration and Compliance Schedules: All existing on-farm
storage facilities shall register with the Department, on forms provided by the
Department, no later than March 31, 2003. The Department shall issue a
compliance schedule to each existing on-farm storage facility registered with
the Department no later than June 30, 2003. The compliance schedule shall
require the submittal of all containment plans and specifications to the
Department no later than March 31, 2004 and the completion of all construction
of required containment structures no later than June 30, 2005.
c) On-Farm Storage Facility Permits: The owner or operator of an
existing or new on-farm storage facility shall obtain an agrichemical
containment permit issued by the Department for each facility. Permits shall
be obtained prior to the commencement of any containment construction and shall
be obtained in accordance with the compliance schedule issued by the Department
pursuant to subsection (b) of this Section.
1) Permit applications shall be submitted on forms provided by
the Department. The application shall be accompanied by detailed engineering
plans and specifications for any construction or modification of a secondary
containment structure to be accomplished pursuant to the Permit. Such plans
and specifications shall be prepared by an Illinois Professional Engineer when
required by the provisions of the Illinois Professional Engineering Practice
Act [225 ILCS 325]. In addition to completed permit application forms and
detailed engineering plans/specifications, documents submitted to the
Department shall include a location area map, detailed plot plan of the
facility, and any additional information the applicant or Department deems
necessary to fully describe the project.
2) A Permit shall be obtained before the commencement of any
construction necessary to meet the compliance date. A Permit must be amended
before the commencement of any modification to the facility. A Permit
amendment shall not be required for alterations at the facility as defined in
Section 255.10 of this Part.
3) A Permit will be transferred to a new owner or operator upon
written notification by the permittee to the Department.
4) Permits shall be renewed every 5 years.
5) An application for a Permit submitted by a corporation shall
be signed by a principal executive officer of at least the level of vice
president, or a duly authorized representative who is responsible for the
overall operation of the facility described in the application. In the case of
a partnership or a sole proprietorship, the application shall be signed by a
general partner or the proprietor, respectively.
6) The Department shall issue a Permit within 90 days after
receipt of the application, provided the documents accompanying the application
indicate that the on-farm storage facility will be in compliance with this Section.
7) The Department shall allow an innovative design to satisfy the
structural requirements of this Section if the application for a Permit is
accompanied by a registered professional engineer's statement certifying that
the design will provide protection to the environment equivalent to that of
this Section.
8) All engineering costs shall be the responsibility of the
person making the request.
9) A Permit issued "with conditions" means that the
facility is deficient in some area in order to meet full compliance with this
Part. A Permit with conditions will be issued if the operation of the facility
during the period of time that the facility owner was correcting the deficiency
does not jeopardize the environment.
10) If the Department fails to grant or deny the Permit as
requested or issue a Permit with conditions within 90 days from the date of
receipt of the application, the applicant may deem the Permit granted for a
one-year period commencing on the 91st day after the Department received the
application. If the application for a Permit is denied, the Department shall
notify the applicant in writing as to why the permit was denied.
d) Liquid Fertilizer and Pesticide Containment Structures and
Systems: Secondary containment structures and systems at on-farm storage
facilities shall provide the following capacity:
1) When not protected from receiving precipitation, the
containment shall have a minimum containment volume of a 6-inch rain storm (a
25 year, 24 hour rain), the capacity of the largest tank, and the volume
displaced by the bases of the other tanks located within the secondary
containment structure.
2) When protected from receiving precipitation, the containment
shall have a minimum containment volume of 100% of the capacity of the largest
tank, plus the volume displaced by the bases of the other tanks located within
the secondary containment structure.
e) Containment structural materials and integrity shall provide
secondary containment that meets or exceeds the requirement of this Section.
Materials shall be compatible with the agrichemical to be contained.
1) General requirements include:
A) Clay, natural soil clay mixtures or clay/bentonite mixtures
shall not be used to contain any pesticide.
B) Secondary containment for liquid agrichemical storage at
facility sites should provide for separation between bulk pesticides and bulk
fertilizer to the extent that a common wall or curbing between the fertilizer
area and the pesticide area shall provide for the interception and recovery,
including clean up of pesticide spills, while the entire secondary containment
area shall meet or exceed the total capacity requirement specified in this
Section.
C) The secondary containment structure shall be constructed to a
water permeability rate of not greater than 1 x 10
-6
centimeters per
second and maintained so that liquid movement through the walls and base does
not exceed a rate of 1 x 10
-5
centimeters per second permeability
rate. The secondary containment structure shall be designed and maintained to
withstand a full hydrostatic head of any contained liquid. The containment
area shall not be equipped with a permanent pump unless the pump has only a
manual mode of operation.
D) The secondary containment structure shall not have a discharge
outlet or gravity drain through the wall or floor.
E) Synthetic materials or liners may be used with secondary
containment structures provided they are compatible with agrichemicals being
contained and are installed according to the manufacturer's written directions
and repaired and maintained according to the manufacturer's recommendations.
These directions and recommendations shall become records maintained at the
facility site.
2) Walls: The walls of secondary containment structures shall
meet each of the following criteria:
A) Walls shall be constructed of materials, including, but not
limited to, steel, reinforced concrete, solid masonry, or compatible synthetic
materials or synthetic liners as authorized in this Section.
B) No piping shall be installed through the wall except for
interconnections between multiple secondary containment structures authorized
in this Section.
C) Multiple basins connected to provide the containment capacity
as set forth in this Section shall be connected in a manner that assures an
unrestricted transfer of discharged liquid between basins.
D) Earthen walls used for secondary containment of fertilizer
shall be protected against erosion (e.g., sodded or seeded). Side slopes shall
not exceed a 3 to 1 ratio of horizontal to vertical. The top width of earthen
walls shall not be less than 2½ feet.
E) Provisions shall be made for safe and emergency access and exit
to and from the secondary containment structures.
3) Floor: The base of a secondary containment structure shall be
lined with materials, including, but not limited to, reinforced concrete,
steel, or compatible synthetic liner or synthetic materials as authorized in
this Section, and the floor shall meet each of the following criteria:
A) Floors shall be constructed to allow the safe and expeditious
removal of precipitation water and any spilled material in a manner that does
not disrupt the ability of the containment structure to prevent the movement of
liquid as required in this Section (e.g., sloped to a collection sump well).
B) Liners used for secondary containment of fertilizer may be
constructed of suitable soil or of soil treated with bentonite clay or other
comparable material, with a minimum depth of 12 inches, provided the other
floor requirements as stated in this Section are met. The liner shall be
covered by a soil or smooth aggregate layer not less than 6 inches thick and
shall be maintained to prevent cracking or puncture.
4) Prefabricated Facilities: A prefabricated secondary
containment structure shall be composed of a rigid prefabricated basin having
both a base and walls constructed of steel, reinforced concrete or synthetic
liner or synthetic materials that are resistant to corrosion, puncture or
cracking. A written confirmation of compatibility and a written estimate of
life expectancy from the basin manufacturer shall be kept on file at the
facility. Multiple basins connected to provide the capacity required in this Section
shall be connected in a manner that assures an unrestricted transfer of
discharged liquid between basins.
5) Drainage and Basin Facility: A drainage and basin facility
diverts uncontaminated storm water drainage and provides secondary containment in
accordance with this Section. The curb, base and drainage path shall be at
least 12 inches thick and shall be constructed in lifts not to exceed 6 inches
in thickness. Persons wishing to use a drainage and basin facility should
consider the overall facility plan, topography, subsoil type, water table
location, and surface water drainage patterns.
f) Tank Anchoring: Non-mobile agrichemical storage containers
shall be anchored or placed on a raised area if necessary to prevent flotation
or instability in the event of agrichemical discharge into the secondary
containment structure.
g) Storage containers and appurtenances shall be constructed,
installed, and maintained so as to prevent the discharge of liquid
agrichemicals and shall meet each of the following criteria:
1) The materials used in construction shall be resistant to
corrosion, puncture, or cracking and shall be compatible with the agrichemical
being stored.
2) The materials used in construction and repair may not be of a
type that reacts chemically or electrolytically with stored agrichemicals in a
way that may weaken the storage container or appurtenances.
3) The metals used for valves, fittings, and storage container
repair on metal containers shall be compatible with the metals used in the
construction of the container so that the combination of metals does not cause
or increase corrosion that may weaken the container or its appurtenances.
4) Containers and appurtenances shall be designed to handle
operating stresses, taking into account hydrostatic head, pressure buildup from
pumps and compressors, and any other foreseeable mechanical stresses to which
the containers and appurtenances may be subject.
h) Security: When persons responsible for an on-farm storage
facility are not present at the facility, the valves on non-mobile agrichemical
storage containers, including sight gauge valves, shall be locked in the closed
position or otherwise secured to prevent discharge. External site gauges shall
not be used with bulk pesticide storage containers.
i) Accumulated precipitation in the secondary containment
structure shall never exceed a level that would impair the holding capacity of
the secondary containment. Such precipitation accumulation should be removed
from the secondary containment system after each storm.
1) Precipitation accumulation containing agrichemicals shall be
used as provided in Section 255.110(e) or disposed of as provided in Section
255.110(g).
2) Precipitation accumulation from containment structures shall
not be discharged from the containment area as surface runoff, except when the
following conditions are met:
A) The containment structures have been previously cleaned and
rinsed of agrichemicals. Proper cleaning of the structure should include
removal of all contained material and the proper washing and rinsing of the
structure. Washing should include the use of a biodegradable detergent, triple
rinsing with water under high pressure, and the removal of all standing fluids
from the containment structure.
B) The discharge shall not cause water quality violations pursuant
to 35 Ill. Adm. Code, Subtitle C, or a pesticide release pursuant to the
Environmental Protection Act [415 ILCS 5].