92 Ill. Adm. Code 530.275
Surety Bond
Section 530
Section 530.275 Surety Bond
a) If required, the permittee shall furnish a surety bond on a
form approved, and in an amount specified, by the Department.
b) General
1) The surety bonds required for utility work and occupancy on
State highway right-of-way are intended primarily to assure the prompt and
satisfactory replacement, repair, and completion of work (at no cost to the
State or its contractors) on State highway facilities that may be damaged or
disrupted by the utility company's operations or occupancy. These bonds are
not to be considered as personal injury and property damage insurance.
2) A surety bond remains in effect until released by the
Department.
3) The monetary value of the surety shall be based on the
potential for highway facility damages which may be related to the type and
volume of transmittent, the physical dimensions of the utility facilities, and
the permittee's history of noncompliance.
4) The Department will accept bonds from only those sureties that
meet the Department's standards for acceptability as set forth in 44 Ill. Adm.
Code 675.240.
5) The bonding company shall commit itself to notify the
Department of its intention to terminate the bond at least 30 days before
termination. The permittee shall provide a substitute surety bond acceptable
to the Department within 15 days after its surety gives a termination notice or
shall remove its facility from, and restore, the right-of-way within that
period of time.
c) Utility Permit Continuing Bond
Surety shall be provided as a continuing bond to remain in
full force and effect for all utility companies issued a general utility permit
providing for long-term or permanent occupancy of State highway right-of-way.
d) Individual Utility Permit Bond
Surety shall be provided by a contractor who constructs or
maintains utility facilities, under permit, for a municipality or other public
body which is not required to maintain a continuing bond. Individual utility
permit bonds are to remain in full force and effect until the specific project
is completed and the highway right-of-way is restored in accordance with
Section 530.250. As a minimum, Individual Utility Permit Bonds remain in full
force and effect for five years from date of permit approval by the Department.
e) Continuing Bond for Utility Contractors
A contractor who has occasion to frequently request permits
for utility work may provide, at its option, a continuing bond. This
arrangement eliminates the need for the contractor to secure an individual
utility permit bond for each project.
f) If the surety bond expires, the permit can be revoked.
AGENCY NOTE: Forms mentioned in
this Part are available from District offices as shown in Section
530.Illustration A or the Department of Transportation, Bureau of Maintenance,
2300 South Dirksen Parkway, Springfield, Illinois, 62764.