92 Ill. Adm. Code 530.710
Methods of Attachment
Section 530
Section 530.710 Methods of
Attachment
a) Prohibited Attachment
No utility attachment to a bridge or traffic structure will
be considered that proposes any of the following practices:
1) Burying conduits or cables in bridge slabs or sidewalks.
2) Drilling holes outside the middle third of the web of load
carrying steel structural elements.
3) Welding on structural steel elements of the structure.
4) Drilling into prestressed or post-tensioned concrete
supporting beams.
5) Casting inserts into the bottom of prestressed concrete
members.
6) Attaching in a manner that will reduce critical clearances.
7) Attaching outside the fascia of the bridge or structure.
8) Gas pipelines over four inches in diameter or having internal
pressure in excess of 75 psig.
9) More than one gas pipeline for each structure.
10) Pipelines carrying liquids or gases of an extraordinarily
hazardous nature shall not be attached to highway structures.
b) Acceptable Attachment Practices
When and where the attachment of a utility to a highway
bridge or structure is given favorable consideration, the following general
practices shall be followed:
1) The attachment shall be located below the floor of the
structure between beams or girders and above the lowest structural member on
existing structures. Conduits may be designed into a new structure for approved
attachments.
2) Supports and hangers shall be designed to clamp or bolt to
steel structural elements.
3) Supports and hangers shall be designed to clamp or bolt to
prestressed or post-tensioned concrete structural elements without drilling.
4) Utility facilities may be hung from inserts drilled on
existing bridges or cast on new construction into non-critical concrete areas
such as the floor slab. Inserts on new construction will be furnished and
installed by the Department and shown in detail on construction plans.
5) The petitioner shall submit plans and specifications showing
the size, weight per foot, and proposed method of attachment of the utility
elements and stating the type of commodity to be transmitted, the proposed
pressure or voltage, and giving the proposed location of cutoffs adjacent to
the structure.
6) A permit for bridge attachment will provide conduit or pipe
capacity for any anticipated expansion. In the interest of simplification, the
assessment charge shall be calculated assuming that all conduits of the
proposed system are filled.
7) All work of attachment and maintenance of the utility
facilities shall be accomplished by the utility. In the case of a new bridge
or traffic structure, the contract special provisions will require the State's
contractor to cooperate with the utility company with the understanding that
the utility company will furnish and install the necessary conduits or pipes
and appurtenances.