92 Ill. Adm. Code 554.506
Horizontal Clearances
Section 554
Section 554.506 Horizontal
Clearances
Horizontal clearances at bridges
and other obstructions must exceed the overall width of the load by 24 inches
or more. Where practical, the load may be raised over handrails in order to
clear. However, if this is proposed, the vertical clearance between the top of
the handrail and the underside of the load must be at least 18 inches.