92 Ill. Adm. Code 800.440

Force Majeure

Year: 2026Length: 109 wordsOfficial source
Section 800 Section 800.440  Force Majeure In the event that the recipient or a contractor is delayed, hindered in, or prevented from the performance of any act required by the contract by reason of any of the following: a)         strikes, lockouts, labor troubles; b)         unduly harsh weather conditions, not including foreseeable and ordinary adverse weather conditions such as rain and snow, which prevent the normal performance of the rehabilitation project; c)         inability to procure materials; d)         failure of power; e)         riots, insurrection, or war; or, f)         any Act of God; the time of performance of such delayed party may be extended for a time period equal to such delay.