92 Ill. Adm. Code 810.30
Definitions
Section 810
Section 810.30 Definitions
The following words or phrases,
when used in this Part, and in conjunction with the federal rules, shall have
the meanings ascribed to them below:
"Benefit/Cost"
– The ratio of project benefits and the net cost of the project.
"Benefits"
are categorized into three groups:
Economic
Benefits – measured as the addition/retention of employment or the avoidable
loss of business and its related jobs to a community.
Public
Benefits – measured as the incremental reduction in directly related government
expenditures resulting from the implementation of the rail project.
Transportation
Benefits – measured as the avoidable, additional cost of transporting affected
freight shipments by other modes or other routing.
"Contract"
– The written agreement between the recipient and the Department defining the
project and terms of the loan or grant.
"Department"
– The Illinois Department of Transportation.
"FRA"
– The Federal Railroad Administration.
"Light
Density Rail Line" – Those rail lines which carry less than 3 million
gross tons per mile per year.
"Local
Rail Service Assistance Program (LRSA)" – The LRSA program provides loans
or grants for capital improvements to light density rail lines and for
substitute service projects. LRSA funding is normally 70 percent federal and
30 percent State or local, but these percentages may change in the future.
Federal funding levels are determined by Congress and may be altered from time
to time due to amendments to the Department of Transportation Act (49 U.S.C.
1654 as amended by the Local Rail Service Assistance Act of 1978).
"Project
Life" – The number of years the recipient is willing to commit itself, or
is required, to provide service over a line. In the benefit/cost analysis,
project life is the period of time over which proposed project benefits and
costs are calculated.
"Recipient"
– Grant or loan recipient.
"Residual
Value of Project Materials" – As determined by the Department, the
residual value will be the expected salvage value of project materials based on
existing market values plus or minus the projected increase or decrease in
value based on price trends.
"Salvage
Value of Extracted Materials" – The expected salvage value of the
materials which would be removed during a line rehabilitation and sold, either
for scrap or reuse. Salvage value will be determined by the Department based
on a survey of existing market prices.
"State
Rail Plan Update" – The document published by the Department every two
years which describes the LRSA program methodology. The plan is also used to
establish project eligibility.
"Substitute
Service" – Assistance designed to reduce the costs of lost rail service in
a manner less expensive than continuing that rail service and includes (but is
not limited to) the acquisition, construction, or improvement of facilities for
the provision of substitute freight transportation services and/or the
relocation of shippers.