30 ILCS 575/2.8

30 ILCS 575/2.8

Last amended: 2022Year: 2026Length: 46 wordsOfficial source
(30 ILCS 575/2.8) (Section scheduled to be repealed on June 30, 2029) Sec. 2.8. Design-build and Construction Manager/General Contractor contracts. This Act applies to any design-build contracts and Construction Manager/General Contractor contracts entered into under the Innovations for Transportation Infrastructure Act. (Source: P.A. 102-1094, eff. 6-15-22.)
30 ILCS 575/2.8 | Justis AI