Indiana · Regulations
Rule 3 — Approved Designer List and Selection of Designer
6 sections
6 sections
- 25 IAC 2-3-125 IAC 2-3-1 List of prequalified designers
- 25 IAC 2-3-225 IAC 2-3-2 Application for prequalification; approval as precondition for selection
- 25 IAC 2-3-325 IAC 2-3-3 Selection procedure for contract designers; qualifications; limitations on subcontractors
- 25 IAC 2-3-425 IAC 2-3-4 Fee proposals for design work; selection procedure for alternate contract designer
- 25 IAC 2-3-525 IAC 2-3-5 Supervision of designer contracts
- 25 IAC 2-3-625 IAC 2-3-6 Designer's duty to assure a bid within budget