Indiana · Regulations
Rule 20 — Well Drilling, Construction and Completion Requirements
15 sections
15 sections
- 312 IAC 29-20-1312 IAC 29-20-1 Notification to inspector
- 312 IAC 29-20-2312 IAC 29-20-2 Access roads, lease roads, well locations, and other construction activities
- 312 IAC 29-20-3312 IAC 29-20-3 Specifications for well casing
- 312 IAC 29-20-4312 IAC 29-20-4 Specifications for cement
- 312 IAC 29-20-5312 IAC 29-20-5 Use of conductor pipe
- 312 IAC 29-20-6312 IAC 29-20-6 Surface casing
- 312 IAC 29-20-7312 IAC 29-20-7 Intermediate casing
- 312 IAC 29-20-8312 IAC 29-20-8 Production casing
- 312 IAC 29-20-9312 IAC 29-20-9 Cement job log
- 312 IAC 29-20-10312 IAC 29-20-10 Approval of alternate well construction methods
- 312 IAC 29-20-11312 IAC 29-20-11 Use of centralizers
- 312 IAC 29-20-12312 IAC 29-20-12 Well control equipment
- 312 IAC 29-20-13312 IAC 29-20-13 Construction requirements for flowing oil wells
- 312 IAC 29-20-14312 IAC 29-20-14 Well completion and recompletion reports
- 312 IAC 29-20-15312 IAC 29-20-15 Approval or denial of applications; notice