Indiana · Regulations
Rule 3 — Public Water Supply Construction Permits
13 sections
13 sections
- 327 IAC 8-3-1327 IAC 8-3-1 Definitions and general requirements
- 327 IAC 8-3-1.1327 IAC 8-3-1.1 Proof of capacity
- 327 IAC 8-3-2327 IAC 8-3-2 PWS construction permits; exemptions; experimental, emergency, and after-the-fact construction permits
- 327 IAC 8-3-2.1327 IAC 8-3-2.1 Permits for construction of small transient and small nontransient noncommunity public water systems
- 327 IAC 8-3-3327 IAC 8-3-3 Application for permits
- 327 IAC 8-3-4327 IAC 8-3-4 Issuance requirements
- 327 IAC 8-3-4.2327 IAC 8-3-4.2 Public water system water main extension early warning order and connection ban
- 327 IAC 8-3-5327 IAC 8-3-5 Modification or revocation of permits
- 327 IAC 8-3-5.5327 IAC 8-3-5.5 Duration of the commissioner's review of an application, plans, and specifications
- 327 IAC 8-3-5.7327 IAC 8-3-5.7 Notification of construction
- 327 IAC 8-3-6327 IAC 8-3-6 Permit no defense to violations
- 327 IAC 8-3-7327 IAC 8-3-7 PWS construction permit fees and annual operation fees
- 327 IAC 8-3-8327 IAC 8-3-8 Incorporation by reference (Repealed)Repealed