Indiana · Regulations
Rule 6 — Storm Water Discharges Exposed to Industrial Activity
15 sections
15 sections
- 327 IAC 15-6-1327 IAC 15-6-1 Purpose
- 327 IAC 15-6-2327 IAC 15-6-2 Applicability of the general permit rule for storm water discharges exposed to industrial activity
- 327 IAC 15-6-3327 IAC 15-6-3 General permit rule boundary
- 327 IAC 15-6-4327 IAC 15-6-4 Definitions
- 327 IAC 15-6-5327 IAC 15-6-5 Additional NOI letter requirements
- 327 IAC 15-6-6327 IAC 15-6-6 Deadline for submittal of an NOI letter; additional information
- 327 IAC 15-6-7327 IAC 15-6-7 General requirements for a storm water pollution prevention plan (SWP3)
- 327 IAC 15-6-7.3327 IAC 15-6-7.3 Monitoring requirements
- 327 IAC 15-6-7.5327 IAC 15-6-7.5 Annual reports
- 327 IAC 15-6-8327 IAC 15-6-8 Standard conditions
- 327 IAC 15-6-8.5327 IAC 15-6-8.5 Permit compliance schedule
- 327 IAC 15-6-9327 IAC 15-6-9 Inspection and enforcement
- 327 IAC 15-6-10327 IAC 15-6-10 Duration of coverage and renewal
- 327 IAC 15-6-11327 IAC 15-6-11 Termination of coverage; permit not transferable
- 327 IAC 15-6-12327 IAC 15-6-12 Conditional no exposure exclusion