Indiana · Regulations
Rule 13.5 — 5. Solid Waste Processing Facilities; Operational Requirements
17 sections
17 sections
- 329 IAC 11-13.5-1329 IAC 11-13.5-1 Applicability
- 329 IAC 11-13.5-2329 IAC 11-13.5-2 Access control
- 329 IAC 11-13.5-3329 IAC 11-13.5-3 On-site roads
- 329 IAC 11-13.5-4329 IAC 11-13.5-4 Signs
- 329 IAC 11-13.5-5329 IAC 11-13.5-5 Processing facilities waste criteria
- 329 IAC 11-13.5-6329 IAC 11-13.5-6 Operational requirements
- 329 IAC 11-13.5-7329 IAC 11-13.5-7 Safety requirements
- 329 IAC 11-13.5-8329 IAC 11-13.5-8 Use of contingency action plan
- 329 IAC 11-13.5-9329 IAC 11-13.5-9 Records and reports
- 329 IAC 11-13.5-10329 IAC 11-13.5-10 Training-transfer stations
- 329 IAC 11-13.5-11329 IAC 11-13.5-11 Inspections of transfer stations
- 329 IAC 11-13.5-12329 IAC 11-13.5-12 Permits required for transfer stations
- 329 IAC 11-13.5-13329 IAC 11-13.5-13 Monitoring and managing incoming waste for transfer stations
- 329 IAC 11-13.5-14329 IAC 11-13.5-14 General operating requirements for transfer stations
- 329 IAC 11-13.5-15329 IAC 11-13.5-15 Infectious waste at transfer stations
- 329 IAC 11-13.5-16329 IAC 11-13.5-16 Incidental transfer of small amounts of whole waste tires at transfer stations
- 329 IAC 11-13.5-17329 IAC 11-13.5-17 Reporting for transfer stations (Repealed)Repealed