329 IAC 4.1-9-2
329 IAC 4.1-9-2 General
Cite as Ind. Admin. Code tit. 329, r. 4.1-9-2
Sec. 2. (a) The owner or operator of an alternative disposal facility must receive written approval from the commissioner as follows:
(1) For an alternative disposal facility for which construction was started before August 13, 2000, written approval must be received
from the commissioner before starting operation under this article.
(2) For an alternative disposal facility for which construction is started on or after August 13, 2000, written approval must be received
from the commissioner before beginning construction.
(b) The owner or operator of an alternative disposal facility shall do the following:
(1) Provide to the department a copy of the written approval from EPA required by 40 CFR 761.60(e).
(2) Comply with the requirements of 329 IAC 4.1-4 through 329 IAC 4.1-6.