330 IAC 3.1-2

330 IAC 3.1-2 State Permits for Construction (Transferred)

TransferredLast amended: 1986Year: 2027Length: 46 wordsOfficial source

Cite as Ind. Admin. Code tit. 330, r. 3.1-2

Rule 2. State Permits for Construction (Transferred) NOTE: Transferred from the Stream Pollution Control Board of the State of Indiana (330 IAC 3.1-2) to the Water Pollution Control Board (330.1 IAC 3-2) by P.L.143-1985, SECTION 209, as amended by P.L.112-1986, SECTION 7, effective April 1, 1986.
330 IAC 3.1-2: 330 IAC 3.1-2 State Permits for Construction (Transferred) | Justis AI